Home Projects More like: MEGASTACK – creating affordable transport fuel from renewable electricity [Clear] # Title Funder Funding Start End Status 1 MEGASTACK – creating affordable transport fuel from renewable electricity Innovate UK £6,995,536 March 31, 2017 March 30, 2018 Closed 2 MEGASTACK – creating affordable transport fuel from renewable electricity Innovate UK £17,488,840 March 31, 2017 March 31, 2018 Closed 3 MEGASTACK – creating affordable transport fuel from renewable electricity Innovate UK £221,000 Nov. 1, 2016 Jan. 31, 2017 Closed 4 Development of very low carbon footprint hydrogen distribution, utilising: 90% lower cost alkaline electrolyser with low cost end-user fuel cell solutions manufacturing Innovate UK £886,744 July 31, 2011 Nov. 30, 2014 Closed 5 Supported MoTe2: proving the viability of a 2D material to be employed in the PEM flow cell for the hydrogen production EPSRC £246,774 Sept. 30, 2022 March 31, 2024 Active 6 Supported MoTe2: proving the viability of a 2D material to be employed in the PEM flow cell for the hydrogen production EPSRC £1,233,870 Sept. 30, 2022 March 31, 2024 Active 7 Project Centurion Feasibility Study Innovate UK £445,595 Sept. 30, 2018 March 30, 2020 Closed 8 Project Centurion Feasibility Study Innovate UK £1,115,550 Sept. 30, 2018 March 31, 2020 Closed 9 Frankenstack ISCF £505,405 June 30, 2018 March 31, 2019 Closed 10 Biogas powered electrolysers for green hydrogen production, compression and creating a localised supply chain. Innovate UK £1,459,761 Dec. 1, 2023 May 31, 2025 Active 11 Development of Novel AEM Water Electrolyser Cell for Hydrogen Production for Energy Storage EPSRC £0 Sept. 30, 2021 March 30, 2025 Active 12 Development of Novel AEM Water Electrolyser Cell for Hydrogen Production for Energy Storage EPSRC £0 Sept. 30, 2021 March 31, 2025 Active 13 AHEAD (Affordable Hydrogen from Electrolysis Accelerating Decarbonisation) Innovate UK £644,788 May 31, 2021 Nov. 30, 2022 Active 14 KES - Kite Energy Scheme Innovate UK £1,901,620 May 31, 2016 Nov. 30, 2018 Closed 15 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC £162,381 Sept. 30, 2022 March 31, 2024 Active 16 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC £88,585 May 31, 2022 Nov. 30, 2023 Active 17 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC £811,905 Sept. 30, 2022 March 31, 2024 Active 18 Electrolysis at scale: a pathway to lower precious metal content electrolysers EPSRC £391,366 Jan. 1, 2023 Dec. 31, 2025 Active 19 Clean hydrogen production by non-membrane electrolysis Innovate UK £677,162 March 1, 2020 Aug. 30, 2021 Closed 20 Integrating a mixed energy vector battolyser into a microgrid NERC £12,770 Aug. 31, 2022 Aug. 30, 2023 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »