More like:
SWEPT 2 [Clear]

# Title Funder Funding Start End Status
1 SWEPT 2 EPSRC
£499,280
June 9, 2015 June 9, 2018 Closed
2 SWEPT2 Innovate UK
£1,356,800
April 30, 2015 April 29, 2018 Closed
3 SWEPT2 Innovate UK
£3,392,000
April 30, 2015 April 30, 2018 Closed
4 Terrestrial Carbon Cycle Dynamics in CMIP5 Last Glacial Maximum and mid-Holocene climate simulations NERC
£182,696
April 30, 2011 May 30, 2012 Closed
5 Development of Unified Flame Surface Density Based Reaction Rate Models for the LES of Turbulent Premixed Flames EPSRC
£274,100
July 31, 2009 June 30, 2011 Closed
6 Development of Unified Flame Surface Density Based Reaction Rate Models for the LES of Turbulent Premixed Flames EPSRC
£387,447
June 30, 2009 Dec. 31, 2012 Closed
7 SWEPT2 EPSRC
£78,596
April 30, 2015 April 29, 2018 Closed
8 SWEPT2 EPSRC
£196,490
April 30, 2015 April 30, 2018 Closed
9 CFD investigations of turbine rim seal physics EPSRC
£0
March 31, 2017 June 29, 2020 Closed
10 CFD Modelling of the acoustic response of sprays EPSRC
£194,258
Jan. 15, 2016 July 13, 2017 Closed
11 Zenotech - CODES Innovate UK
£497,880
July 31, 2012 July 31, 2013 Closed
12 Accelerating Computational Fluid Dynamics EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
13 FC-AMS (Fuel Cell Air Management System) with improved Balance of Plant based on innovative turbo-compressor technology and integrated systems engineering Innovate UK
£853,998
Feb. 1, 2010 March 30, 2012 Closed
14 Real Time Digital Twins for Structural Health Diagnostics EPSRC
£0
Sept. 30, 2020 Sept. 30, 2023 Closed
15 Wake Properties Prediction by means of machine learning algorithms EPSRC
£0
Sept. 30, 2021 Sept. 29, 2025 Active
16 Wake Properties Prediction by means of machine learning algorithms EPSRC
£0
Dec. 1, 2022 Nov. 30, 2026 Active
17 Wake Properties Prediction by means of machine learning algorithms EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Closed
18 Assessment and mitigation of Hydrogen fuelled vehicle hazards EPSRC
£0
Sept. 30, 2020 Sept. 30, 2024 Active
19 EXTREME WAVE LOADING ON OFFSHORE WAVE ENERGY DEVICES USING CFD: A HIERARCHICAL TEAM APPROACH EPSRC
£448,180
Sept. 30, 2006 Dec. 31, 2007 Closed
20 EXTREME WAVE LOADING ON OFFSHORE WAVE ENERGY DEVICES USING CFD: A HIERARCHICAL TEAM APPROACH EPSRC
£0
Jan. 1, 2008 Sept. 30, 2009 Closed
Reset