Home Projects More like: Transforming the offshore oil and gas supply chain [Clear] # Title Funder Funding Start End Status 81 FCL/B: An Integrated VSC-HVDC Fault Current Limiter/Breaker EPSRC £1,280,436 July 30, 2014 Feb. 28, 2018 Closed 82 FCL/B: An Integrated VSC-HVDC Fault Current Limiter/Breaker EPSRC £3,201,090 July 30, 2014 Feb. 28, 2018 Closed 83 Project HOST (Hydrogen and Oxygen South Thames) Innovate UK £219,201 Aug. 31, 2021 March 30, 2022 Closed 84 Sustainable Ventures Development Partners (Community-led Electric Vehicle Car Clubs) Innovate UK £120,000 Dec. 1, 2011 March 31, 2012 Closed 85 Reducing Maritime Emissions Innovate UK £393,657 Feb. 1, 2022 Feb. 28, 2023 Active 86 Digitalisation for operational efficiency and GHG emission reduction at container ports EPSRC £213,025 Feb. 1, 2022 Jan. 31, 2023 Closed 87 SMAHRT - Scalable Modular Ammonia to Hydrogen Refueling Terminal Innovate UK £108,684 Sept. 30, 2020 Dec. 31, 2020 Closed 88 SMAHRT - Scalable Modular Ammonia to Hydrogen Refueling Terminal Innovate UK £271,710 Sept. 30, 2020 Dec. 31, 2020 Closed 89 TransEnergy - Road to Rail Energy Exchange (R2REE) EPSRC £3,041,178 July 31, 2016 July 30, 2021 Closed 90 TransEnergy - Road to Rail Energy Exchange (R2REE) EPSRC £7,602,945 July 31, 2016 July 31, 2021 Closed 91 Dover Clean Ferry Power (DCFP): Techno-Economic Feasibility Analysis of Electric Power Solutions for Port of Dover Ferries Innovate UK £651,670 Aug. 31, 2021 March 30, 2022 Active 92 SOV Offshore Charging System Innovate UK £4,628,910 Jan. 1, 2023 Oct. 31, 2023 Active 93 Net Zero Teesside Onshore ISCF £140,244,826 March 1, 2021 Aug. 31, 2023 Closed 94 Accelerating Cross-sector Collaborative Ecosystems and Sustainable Supply-chains (ACCESS) Innovate UK £1,974,250 Sept. 30, 2020 Sept. 30, 2021 Closed 95 Application of microwaves on the production of liquid biofuels EPSRC £201,984 Aug. 31, 2017 Feb. 29, 2020 Closed 96 Application of microwaves on the production of liquid biofuels EPSRC £504,960 Aug. 31, 2017 Feb. 29, 2020 Closed 97 Tidal array cost reduction: Testing a removable nacelle design for DeltaStream Technology EPSRC £202,016 April 30, 2016 April 29, 2017 Closed 98 Tidal array cost reduction: Testing a removable nacelle design for DeltaStream Technology EPSRC £505,040 April 30, 2016 April 30, 2017 Closed 99 D-FLOWS: Data For Livestock Optimisations for Wiser Supply chains Innovate UK £395,000 Jan. 1, 2022 June 29, 2023 Active 100 Smart Transient Gas Distribution Network Operations Advisor Platform Innovate UK £1,222,395 Aug. 31, 2018 Aug. 31, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »