# Title Funder Funding Start End Status
61 Modelling and Optimisation of Arrays of Novel Bio-Mimetic Energy Harvesters. Energy: Fluid Dynamics and Aerodynamics EPSRC
£0
Oct. 2, 2016 March 31, 2020 Closed
62 Creativity Workshop to Optimise Waste Heat Recovery Innovate UK
£10,000
March 31, 2013 Oct. 31, 2013 Closed
63 Development and Applications of Aberration Corrected Environmental STEM (AC ESTEM) for Dynamic In-Situ Reaction Studies of Nanoparticle Catalysts EPSRC
£2,745,960
Nov. 1, 2012 Dec. 31, 2016 Closed
64 An improved empirical model of soil carbon dynamics in temperate ecosystems NERC
£353,860
Jan. 2, 2007 June 30, 2009 Closed
65 Auto-Fungan: Automating the continuous anaerobic digestion of wheat straw by co-cultures of fungi and methanogens EPSRC
£590,812
June 28, 2018 Dec. 8, 2019 Closed
66 Auto-Fungan: Automating the continuous anaerobic digestion of wheat straw by co-cultures of fungi and methanogens EPSRC
£338,892
Dec. 9, 2019 June 27, 2022 Closed
67 Atmospheric Observation-based Evaluation of Fossil Fuel CO2 Emissions in London NERC
£80,648
Nov. 1, 2022 Oct. 31, 2023 Active
68 Understanding Reaction Mechanisms, Kinetics and Structural Evolution in Low-Carbon Cements EPSRC
£0
Sept. 26, 2021 March 26, 2025 Active
69 CO2 sensor for Demand Controlled Ventilation Innovate UK
£468,040
Sept. 30, 2011 Sept. 29, 2013 Closed
70 The Collective of Transform Ensembles (COTE) for Time Series Classification EPSRC
£48,832
April 30, 2015 April 29, 2018 Closed
71 The Collective of Transform Ensembles (COTE) for Time Series Classification EPSRC
£635,606
April 30, 2015 Oct. 31, 2018 Closed
72 The Collective of Transform Ensembles (COTE) for Time Series Classification EPSRC
£1,589,015
April 30, 2015 Oct. 31, 2018 Closed
73 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC
£2,548,872
Sept. 30, 2014 Sept. 29, 2016 Closed
74 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC
£1,455,818
Sept. 30, 2016 June 29, 2019 Closed
75 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC
£6,372,180
Sept. 30, 2014 Sept. 30, 2016 Closed
76 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC
£3,639,545
Sept. 30, 2016 June 30, 2019 Closed
77 Predicting Pit-to-Crack Transition by Using Peridynamics EPSRC
£0
Sept. 30, 2017 March 31, 2021 Closed
78 University of Bath - Equipment Account EPSRC
£7,856,820
Aug. 4, 2013 Oct. 31, 2017 Closed
79 The HIVE - Resource costs EPSRC
£235,398
Aug. 4, 2013 Aug. 3, 2016 Closed
80 Increasing the adoption of Digital Twin solutions within the built environment for achieving net zero Innovate UK
£48,964
Nov. 1, 2022 April 29, 2023 Active
Reset