Home Projects More like: ON-LINE AND ON-ENGINE CATALYST CHARACTERISATION - A DIAGNOSTIC TECHNIQUE TO DESIGN A BETER CATALYST [Clear] # Title Funder Funding Start End Status 81 Development of a lift based wave energy converter (WEC) EPSRC £0 Sept. 30, 2021 March 31, 2025 Closed 82 Novel constraints on sources and sinks of methane and carbon monoxide from measurements and modelling of radiocarbon NERC £668,260 Dec. 1, 2022 Nov. 30, 2025 Active 83 Novel constraints on sources and sinks of methane and carbon monoxide from measurements and modelling of radiocarbon NERC £3,341,300 Dec. 1, 2022 Nov. 30, 2025 Active 84 Catalytic people heater Innovate UK £38,815 Nov. 1, 2022 April 29, 2023 Active 85 ESCROWS: Electrolytic-Free Single-Stage Converter for Reliable Offshore Wind Systems EPSRC £549,582 Nov. 1, 2020 Feb. 28, 2023 Active 86 ESCROWS: Electrolytic-Free Single-Stage Converter for Reliable Offshore Wind Systems EPSRC £1,373,955 Nov. 1, 2020 Aug. 28, 2023 Closed 87 Towards fault-tolerant, reliable, efficient, and economical DC-DC conversion for DC grid (FREE-DC) EPSRC £1,183,204 June 30, 2023 Sept. 30, 2025 Active 88 Computational and communication architectures for MMC VSC-HVDC Construction EPSRC £0 Sept. 11, 2018 March 30, 2022 Active 89 Computational and communication architectures for MMC VSC-HVDC Construction EPSRC £0 Sept. 30, 2018 March 31, 2022 Closed 90 Reducing the levelised cost of energy (LCOE) in offshore wind through a disruptive silicon carbide converter technology, SiCtek Innovate UK £331,760 Sept. 30, 2020 June 29, 2021 Closed 91 Reducing carbon emissions in shipping: Tax incentives, optimisation and prediction EPSRC £0 Sept. 27, 2020 Sept. 29, 2024 Active 92 Beyond Biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials NERC £140,630 March 31, 2013 Sept. 29, 2013 Closed 93 Beyond Biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials NERC £351,575 March 31, 2013 Sept. 30, 2013 Closed 94 Enabling the circular economy of sustainable metals production at scale through AI-powered systems to support a net-zero future. Innovate UK £4,999,475 May 14, 2023 May 15, 2024 Active 95 Analysis and control of electrical networks dominated by power electronic converters EPSRC £0 Sept. 30, 2019 March 30, 2023 Active 96 Analysis and control of electrical networks dominated by power electronic converters EPSRC £0 Sept. 30, 2019 June 30, 2023 Closed 97 Three-dimensional laccase electrodes for miniaturised fuel cell power sources EPSRC £859,820 Jan. 15, 2011 Nov. 29, 2013 Closed 98 Three-dimensional laccase electrodes for miniaturised fuel cell power sources EPSRC £1,852,208 June 30, 2008 Jan. 15, 2011 Closed 99 Three-dimensional laccase electrodes for miniaturised fuel cell power sources EPSRC £4,630,520 June 30, 2008 Jan. 15, 2011 Closed 100 Three-dimensional laccase electrodes for miniaturised fuel cell power sources EPSRC £2,149,550 Jan. 15, 2011 Nov. 29, 2013 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »