Home Projects More like: Deploying novel remote sensing solutions to increase the efficiency of dredging operations and coastal management at the port of Beira, Mozambique [Clear] # Title Funder Funding Start End Status 1 Green Shipping Corridors: Feasibility of the world’s first hydrogen powered North Sea crossing Innovate UK £810,730 Jan. 1, 2023 Aug. 31, 2023 Closed 2 Taken at the Flood: ensuring sustainable heritage strategies for green energy development in the North Sea AHRC £4,062,845 Aug. 31, 2022 Nov. 30, 2025 Active 3 SUPPORTIVE-SUPercapacitors for zero emission PORT-sIde VEhicles Innovate UK £1,297,725 Aug. 31, 2021 March 30, 2022 Active 4 Engineering with Nature: combining Artificial intelligence, Remote sensing and computer Models for the optimum design of coastal protection schemes EPSRC £1,522,438 Nov. 1, 2021 Oct. 31, 2026 Active 5 The Kelp System Innovate UK £48,878 Nov. 1, 2022 April 29, 2023 Active 6 Infrastructure for Port And Coastal cities and Towns network (iPACT) EPSRC £938,914 March 1, 2022 Feb. 29, 2024 Active 7 Resilient coasts: optimising co-benefit solutions (Co-Opt) NERC £747,834 Aug. 13, 2021 Aug. 12, 2024 Active 8 Resilient coasts: optimising co-benefit solutions (Co-Opt) NERC £1,125,860 Nov. 1, 2021 Oct. 31, 2024 Active 9 Resilient coasts: optimising co-benefit solutions NERC £763,170 Nov. 1, 2021 Oct. 31, 2024 Active 10 Resilient coasts: optimising co-benefit solutions (Co-Opt) NERC £610,866 Nov. 1, 2021 Oct. 31, 2024 Active 11 Interactions of flow, tidal stream turbines and local sediment bed under combined waves and tidal conditions (INSTRON) EPSRC £1,709,364 Sept. 27, 2012 Feb. 27, 2016 Closed 12 Interactions of flow, tidal stream turbines and local sediment bed under combined waves and tidal conditions (INSTRON) EPSRC £4,273,410 Sept. 27, 2012 Feb. 27, 2016 Closed 13 Sandscaping for Mitigating Coastal Flood and Erosion Risk to Energy Infrastructure on Gravel Shorelines: a case study approach NERC £92,420 Oct. 9, 2014 April 8, 2015 Closed 14 Sandscaping for Mitigating Coastal Flood and Erosion Risk to Energy Infrastructure on Gravel Shorelines: a case study approach NERC £231,050 Oct. 9, 2014 April 9, 2015 Closed 15 Overseas Travel Grant for a Maritime Logistics Symposium and a Research Visit at Shanghai EPSRC £23,914 July 11, 2010 Oct. 10, 2010 Closed 16 Overseas Travel Grant for a Maritime Logistics Symposium and a Research Visit at Shanghai EPSRC £24,912 Sept. 29, 2010 Dec. 29, 2010 Closed 17 GNSS Wave Glider: A new tool for sea level and sea state measurement NERC £318,496 July 20, 2015 March 30, 2017 Closed 18 GNSS Wave Glider: A new tool for sea level and sea state measurement NERC £284,426 Sept. 29, 2013 March 30, 2017 Closed 19 GNSS Wave Glider: A new tool for sea level and sea state measurement NERC £1,013,184 July 4, 2013 June 29, 2015 Closed 20 GNSS Wave Glider: A new tool for sea level and sea state measurement NERC £711,065 Sept. 29, 2013 March 31, 2017 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »