Home Projects More like: HOME-Offshore: Holistic Operation and Maintenance for Energy from Offshore Wind Farms [Clear] # Title Funder Funding Start End Status 41 O&M Optimisation for the X-Rotor Wind Turbine Concept EPSRC £0 Sept. 30, 2019 Sept. 30, 2023 Closed 42 Reliability analysis, diagnosis and prognosis of direct drive and medium speed generators EPSRC £538,768 March 1, 2021 Feb. 28, 2023 Active 43 Reliability analysis, diagnosis and prognosis of direct drive and medium speed generators EPSRC £1,346,920 March 1, 2021 Feb. 29, 2024 Active 44 Energy storage; Control of capillary pressure on hydrogen flow characteristics through reservoir rock and caprock integrity EPSRC £0 Aug. 31, 2019 Jan. 31, 2024 Active 45 Modelling the Impact of Large Floating Wind Turbines on Offshore Navigation and Safety Critical Radar Systems EPSRC £276,434 Feb. 1, 2019 April 29, 2020 Closed 46 Modelling the Impact of Large Floating Wind Turbines on Offshore Navigation and Safety Critical Radar Systems EPSRC £691,085 Feb. 1, 2019 April 30, 2020 Closed 47 SUPERGEN WIND ENERGY TECHNOLOGIES-CORE, Towards the Offshore Wind Power Station EPSRC £9,668,380 March 23, 2010 Sept. 29, 2014 Closed 48 SUPERGEN WIND ENERGY TECHNOLOGIES-CORE, Towards the Offshore Wind Power Station EPSRC £24,170,950 March 23, 2010 Sept. 30, 2014 Closed 49 Energy Transfer for Offshore Wind Energy EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 50 Scaling tidal energy arrays EPSRC £0 Aug. 31, 2021 Aug. 31, 2025 Active 51 Predictive Modelling in Complex Uncertain Environments: Optimised exploitation of physics and data EPSRC £1,158,748 June 28, 2018 Jan. 28, 2022 Closed 52 EPSRC and NERC Centre for Doctoral Training in Offshore Renewable Energy (IDCORE) EPSRC £12,268,672 Sept. 30, 2019 March 30, 2028 Active 53 EPSRC and NERC Centre for Doctoral Training in Offshore Renewable Energy (IDCORE) EPSRC £31,276,986 Sept. 30, 2019 March 31, 2028 Active 54 Improving the Bankability of Floating Wind EPSRC £0 Aug. 31, 2019 Feb. 29, 2024 Active 55 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £2,580,280 June 30, 2021 June 29, 2026 Active 56 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £6,450,700 June 30, 2021 June 30, 2026 Active 57 Probabilistic assessment of structural integrity of composite components in offshore wind energy EPSRC £0 Aug. 31, 2021 Aug. 31, 2025 Active 58 ESCROWS: Electrolytic-Free Single-Stage Converter for Reliable Offshore Wind Systems EPSRC £549,582 Nov. 1, 2020 Feb. 28, 2023 Active 59 ESCROWS: Electrolytic-Free Single-Stage Converter for Reliable Offshore Wind Systems EPSRC £1,373,955 Nov. 1, 2020 Aug. 28, 2023 Closed 60 Developing Offshore Floating Technology EPSRC £0 Aug. 31, 2022 Aug. 31, 2026 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »