More like:
A3C Carbon Capture [Clear]

# Title Funder Funding Start End Status
41 Co-benefits of energy networks integration technologies for system operation EPSRC, NERC
£0
Sept. 30, 2018 March 31, 2023 Closed
42 Low Cost Nuclear Phase 1 Innovate UK
£35,477,386
Nov. 1, 2019 June 29, 2021 Closed
43 Low Cost Nuclear Phase 1 ISCF
£88,693,465
Nov. 1, 2019 June 30, 2021 Closed
44 GASCHEM: Optimising industrial gas fermentation for commercial low-carbon fuel & chemical production through systems and synthetic biology approaches BBSRC
£4,792,272
Aug. 30, 2013 Feb. 2, 2019 Closed
45 GASCHEM: Optimising industrial gas fermentation for commercial low-carbon fuel & chemical production through systems and synthetic biology approaches BBSRC
£11,980,680
Aug. 30, 2013 Feb. 2, 2019 Closed
46 Electrolysis at scale: a pathway to lower precious metal content electrolysers EPSRC
£391,366
Jan. 1, 2023 Dec. 31, 2025 Active
47 Autonomous Inspection for Responsive and Sustainable Nuclear Fuel Manufacture (AIRS-NFM) EPSRC
£2,998,732
Sept. 5, 2021 Sept. 4, 2024 Active
48 Autonomous Inspection for Responsive and Sustainable Nuclear Fuel Manufacture (AIRS-NFM) EPSRC
£7,496,830
Sept. 5, 2021 June 5, 2025 Closed
49 Novel intensified liquid-liquid contactors for mass transfer in sustainable energy generation. EPSRC
£395,448
May 31, 2017 Dec. 31, 2018 Closed
50 Novel intensified liquid-liquid contactors for mass transfer in sustainable energy generation. EPSRC
£988,620
May 31, 2017 Dec. 31, 2018 Closed
51 Feasibility experiments to quantify the compatibility of C-Capture’s solvent technology with the requirements of the glass manufacturing industry Innovate UK
£119,200
Sept. 30, 2020 Dec. 31, 2020 Closed
52 Multi Vector Energy Distribution System Modelling and Optimisation with Integrated Demand Side Response EPSRC
£483,202
Aug. 31, 2014 Aug. 30, 2017 Closed
53 Multi Vector Energy Distribution System Modelling and Optimisation with Integrated Demand Side Response EPSRC
£1,208,005
Aug. 31, 2014 Aug. 31, 2017 Closed
54 ECML Net Zero Traction Decarbonisation Demonstration Innovate UK
£59,983
Sept. 30, 2022 Dec. 31, 2022 Active
55 Magnetic metal-organic framework composites for pollutant gas capture EPSRC
£0
Sept. 30, 2019 Sept. 29, 2023 Active
56 Magnetic metal-organic framework composites for pollutant gas capture EPSRC
£0
Sept. 30, 2019 Sept. 30, 2023 Closed
57 Decarbonising the Production of Large Scale Forgings and Castings Innovate UK
£169,272
June 30, 2021 Aug. 30, 2022 Active
58 Decarbonising the Production of Large Scale Forgings and Castings Innovate UK
£423,180
June 30, 2021 Aug. 31, 2022 Closed
59 Assessing the feasibility of vertical farming for second generation bioenergy crops NERC
£270,754
April 19, 2020 June 18, 2022 Closed
60 Assessing the feasibility of vertical farming for second generation bioenergy crops NERC
£731,054
Jan. 1, 2018 April 18, 2020 Closed
Reset