Home Projects More like: SOIL STABILISATION USING INTEGRATED DESIGN OF LOW CO2 ALTERNATIVE CEMENTITIOUS BINDERS [Clear] # Title Funder Funding Start End Status 61 Measurement of graphene dispersion in cementitious systems Innovate UK £7,764 Sept. 30, 2022 Dec. 31, 2022 Active 62 South Wales With Both Eyes Open: A Fast Start Project ISCF £1,130,385 July 31, 2020 July 31, 2021 Closed 63 Durable Low Carbon Reinforced Concrete for Challenging Environments (DULCET) Innovate UK £668,054 Feb. 1, 2022 July 30, 2023 Active 64 Scotland's Net Zero Roadmap (SNZR) Innovate UK £1,732,181 Jan. 1, 2021 March 30, 2023 Active 65 Process Intensification of Biological Methanation (BM) Systems EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 66 ViridiCO2 Catalytic Solutions Innovate UK £596,198 Sept. 30, 2021 Sept. 29, 2022 Closed 67 Paper, Ash and Resin: Valorisation of Foundation Industry Waste Streams Innovate UK £387,934 July 31, 2020 Oct. 30, 2021 Closed 68 Mimicrete – Advancing Self-Healing Concrete Using Vascular Networks. Innovate UK £315,250 June 30, 2022 Dec. 31, 2023 Active 69 Investigation of thermo-mechanical performance of PCM incorporated Geothermal Energy Pile (PCMinGEEP) EPSRC £428,708 Nov. 1, 2019 Oct. 31, 2022 Active 70 Investigation of thermo-mechanical performance of PCM incorporated Geothermal Energy Pile (PCMinGEEP) EPSRC £1,071,770 Nov. 1, 2019 Oct. 31, 2022 Closed 71 Using novel biotechnology process to scale zero-carbon concrete and create a BioConcrete block product Innovate UK £49,991 Nov. 1, 2022 April 29, 2023 Active 72 GigaWatt-Hour Subsurface Thermal Energy storAge: Engineered structures and legacy Mine shafts: STEaM EPSRC £978,269 Aug. 12, 2022 Aug. 11, 2024 Active 73 GigaWatt-Hour Subsurface Thermal Energy storAge: Engineered structures and legacy Mine shafts: STEaM EPSRC £215,571 June 30, 2022 June 29, 2024 Active 74 GigaWatt-Hour Subsurface Thermal Energy storAge: Engineered structures and legacy Mine shafts: STEaM EPSRC £4,891,345 Aug. 12, 2022 Feb. 12, 2025 Active 75 C2 Technology: Micro-turbine Based Modular Energy Conversion Systems (MECS) Feasibility Study Innovate UK £113,676 Sept. 30, 2020 June 29, 2021 Closed 76 C2 Technology: Micro-turbine Based Modular Energy Conversion Systems (MECS) Feasibility Study Innovate UK £284,190 Sept. 30, 2020 June 30, 2021 Closed 77 Small-scale hydrogen production utilising a waste company's RDF feedstock to power its own commercial fleet. Innovate UK £1,011,620 Nov. 1, 2021 July 31, 2022 Closed 78 High Value, low CO2 active binder concrete products Innovate UK £542,004 June 30, 2009 Dec. 31, 2012 Closed 79 Decarbonising Chemicals Through CO2-Biomanufacturing Innovate UK £358,487 Sept. 30, 2022 March 31, 2024 Active 80 Next-Generation Low-Carbon Cement Wasteforms for Safe Disposal of Radioactive Waste EPSRC £0 Sept. 25, 2022 Sept. 24, 2026 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »