# Title Funder Funding Start End Status
21 Characterization of major overburden leakage pathways above sub-seafloor CO2 storage reservoirs in the North Sea (CHIMNEY) NERC
£1,051,125
April 30, 2016 Oct. 31, 2021 Closed
22 Characterization of major overburden leakage pathways above sub-seafloor CO2 storage reservoirs in the North Sea (CHIMNEY) NERC
£414,400
Nov. 1, 2019 Oct. 31, 2021 Closed
23 Characterization of major overburden leakage pathways above sub-seafloor CO2 storage reservoirs in the North Sea (CHIMNEY) NERC
£3,066,570
April 30, 2016 Oct. 31, 2021 Closed
24 Towards Safe Geological Disposal of Radioactive Waste in Lower-Strength Sedimentary Rocks (GeoSafe). NERC
£2,441,850
Sept. 30, 2023 Sept. 30, 2027 Active
25 Towards Safe Geological Disposal of Radioactive Waste in Lower-Strength Sedimentary Rocks (GeoSafe) NERC
£4,297,940
Sept. 30, 2023 Sept. 30, 2027 Active
26 Towards Safe Geological Disposal of Radioactive Waste in Lower-Strength Sedimentary Rocks (GEOSAFE). NERC
£6,305,185
Sept. 30, 2023 Sept. 30, 2027 Active
27 Towards Safe Geological Disposal of Radioactive Waste in Lower-Strength Sedimentary Rocks (GeoSafe) NERC
£1,545,900
Oct. 1, 2023 Oct. 1, 2027 Active
28 Towards Safe Geological Disposal of Radioactive Waste in Lower-Strength Sedimentary Rocks (GeoSafe) NERC
£1,111,140
Sept. 30, 2023 Sept. 30, 2027 Active
29 Towards Safe Geological Disposal of Radioactive Waste in Lower-Strength Sedimentary Rocks (GeoSafe) NERC
£3,834,725
Sept. 30, 2023 Oct. 1, 2027 Active
30 Towards Safe Geological Disposal of Radioactive Waste in Lower-Strength Sedimentary Rocks (GeoSafe) NERC
£2,020,940
Sept. 30, 2023 Sept. 30, 2027 Active
31 Quantifying Ridge Flank Hydrothermal Alteration on the Juan de Fuca Ridge: IODP Expedition 327 NERC
£35,024
June 3, 2013 Dec. 3, 2013 Closed
32 Quantifying Ridge Flank Hydrothermal Alteration on the Juan de Fuca Ridge: IODP Expedition 327 NERC
£87,560
June 3, 2013 Dec. 3, 2013 Closed
33 Controls on the high-grade gold-cobalt mineralisation at Rajapalot, Finland NERC
£0
Sept. 30, 2022 March 30, 2026 Active
34 GigaWatt-Hour Subsurface Thermal Energy storAge: Engineered structures and legacy Mine shafts: STEaM EPSRC
£978,269
Aug. 12, 2022 Aug. 11, 2024 Active
35 GigaWatt-Hour Subsurface Thermal Energy storAge: Engineered structures and legacy Mine shafts: STEaM EPSRC
£215,571
June 30, 2022 June 29, 2024 Active
36 GigaWatt-Hour Subsurface Thermal Energy storAge: Engineered structures and legacy Mine shafts: STEaM EPSRC
£4,891,345
Aug. 12, 2022 Feb. 12, 2025 Active
37 4D quantification of micro-scale feedbacks in dehydrating, deforming rocks NERC
£3,237,355
Jan. 1, 2020 July 31, 2023 Closed
38 A Selective Fragmentation (SELFRAG) device for liberating minerals, microfossils from rocks: more efficient, effective and safer for the UK community. NERC
£586,884
Sept. 30, 2019 March 30, 2020 Closed
39 The effects of fluid flow on the transport properties of faults in Enhanced Geothermal Systems EPSRC
£0
Sept. 29, 2019 June 30, 2023 Closed
40 Purchase of a tandem LA-LIBS femtosecond laser system for the UK NERC
£1,910,760
Jan. 22, 2021 Dec. 31, 2021 Closed
Reset