Home Projects More like: Dating and Isotopic Characterisation for Decarbonisation, Energy, Environment (DICharDEE) [Clear] # Title Funder Funding Start End Status 21 Characterization of major overburden leakage pathways above sub-seafloor CO2 storage reservoirs in the North Sea (CHIMNEY) NERC £1,051,125 April 30, 2016 Oct. 31, 2021 Closed 22 Characterization of major overburden leakage pathways above sub-seafloor CO2 storage reservoirs in the North Sea (CHIMNEY) NERC £414,400 Nov. 1, 2019 Oct. 31, 2021 Closed 23 Characterization of major overburden leakage pathways above sub-seafloor CO2 storage reservoirs in the North Sea (CHIMNEY) NERC £3,066,570 April 30, 2016 Oct. 31, 2021 Closed 24 Towards Safe Geological Disposal of Radioactive Waste in Lower-Strength Sedimentary Rocks (GeoSafe). NERC £2,441,850 Sept. 30, 2023 Sept. 30, 2027 Active 25 Towards Safe Geological Disposal of Radioactive Waste in Lower-Strength Sedimentary Rocks (GeoSafe) NERC £4,297,940 Sept. 30, 2023 Sept. 30, 2027 Active 26 Towards Safe Geological Disposal of Radioactive Waste in Lower-Strength Sedimentary Rocks (GEOSAFE). NERC £6,305,185 Sept. 30, 2023 Sept. 30, 2027 Active 27 Towards Safe Geological Disposal of Radioactive Waste in Lower-Strength Sedimentary Rocks (GeoSafe) NERC £1,545,900 Oct. 1, 2023 Oct. 1, 2027 Active 28 Towards Safe Geological Disposal of Radioactive Waste in Lower-Strength Sedimentary Rocks (GeoSafe) NERC £1,111,140 Sept. 30, 2023 Sept. 30, 2027 Active 29 Towards Safe Geological Disposal of Radioactive Waste in Lower-Strength Sedimentary Rocks (GeoSafe) NERC £3,834,725 Sept. 30, 2023 Oct. 1, 2027 Active 30 Towards Safe Geological Disposal of Radioactive Waste in Lower-Strength Sedimentary Rocks (GeoSafe) NERC £2,020,940 Sept. 30, 2023 Sept. 30, 2027 Active 31 Quantifying Ridge Flank Hydrothermal Alteration on the Juan de Fuca Ridge: IODP Expedition 327 NERC £35,024 June 3, 2013 Dec. 3, 2013 Closed 32 Quantifying Ridge Flank Hydrothermal Alteration on the Juan de Fuca Ridge: IODP Expedition 327 NERC £87,560 June 3, 2013 Dec. 3, 2013 Closed 33 Controls on the high-grade gold-cobalt mineralisation at Rajapalot, Finland NERC £0 Sept. 30, 2022 March 30, 2026 Active 34 GigaWatt-Hour Subsurface Thermal Energy storAge: Engineered structures and legacy Mine shafts: STEaM EPSRC £978,269 Aug. 12, 2022 Aug. 11, 2024 Active 35 GigaWatt-Hour Subsurface Thermal Energy storAge: Engineered structures and legacy Mine shafts: STEaM EPSRC £215,571 June 30, 2022 June 29, 2024 Active 36 GigaWatt-Hour Subsurface Thermal Energy storAge: Engineered structures and legacy Mine shafts: STEaM EPSRC £4,891,345 Aug. 12, 2022 Feb. 12, 2025 Active 37 4D quantification of micro-scale feedbacks in dehydrating, deforming rocks NERC £3,237,355 Jan. 1, 2020 July 31, 2023 Closed 38 A Selective Fragmentation (SELFRAG) device for liberating minerals, microfossils from rocks: more efficient, effective and safer for the UK community. NERC £586,884 Sept. 30, 2019 March 30, 2020 Closed 39 The effects of fluid flow on the transport properties of faults in Enhanced Geothermal Systems EPSRC £0 Sept. 29, 2019 June 30, 2023 Closed 40 Purchase of a tandem LA-LIBS femtosecond laser system for the UK NERC £1,910,760 Jan. 22, 2021 Dec. 31, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »