Home Projects More like: In-depth Studies of OxyCoal Combustion Processes through Numerical Modelling and 3D Flame Imaging [Clear] # Title Funder Funding Start End Status 41 EPSRC Centre for Doctoral Training in Carbon Capture and Storage and Cleaner Fossil Energy EPSRC £17,639,430 March 31, 2014 Sept. 14, 2024 Active 42 Step Change Adsorbents and Processes for CO2 Capture. EPSRC £7,904,405 Nov. 1, 2009 Oct. 31, 2013 Closed 43 Oxyfuel Combustion - Academic Programme for the UK EPSRC £8,688,675 Nov. 1, 2009 July 31, 2014 Closed 44 Uncovering Fundamental Mechanisms to Enable Sustainable Steel Manufacturing EPSRC £2,320,158 March 31, 2016 March 30, 2022 Closed 45 Oxycoal UK EPSRC £335,612 Jan. 1, 2007 June 29, 2009 Closed 46 Net Zero: Flame Instability of Ammonia Aerosol Combustion STFC £280,274 Feb. 1, 2022 Jan. 31, 2023 Active 47 Direct Numerical Simulation and Advanced Modelling of Turbulent Flame Kernels for High-Efficiency Low-Emission Spark Ignition Engine EPSRC £0 Sept. 30, 2019 Aug. 30, 2024 Active 48 Study of Supercritical Coal Fired Power Plant Dynamic Responses and Control for Grid Code Compliance EPSRC £3,627,210 Dec. 1, 2009 Jan. 10, 2011 Closed 49 Study of Supercritical Coal Fired Power Plant Dynamic Responses and Control for Grid Code Compliance EPSRC £2,968,295 Feb. 1, 2011 Aug. 15, 2014 Closed 50 Combustor thermoacoustics for multi-burner low emissions gas turbines (CHAMBER) EPSRC £1,514,258 Jan. 1, 2017 Dec. 31, 2020 Closed 51 Additive Manufactured, High Temperature Micro-gas Turbine Combustor EPSRC £0 Sept. 30, 2017 Sept. 29, 2021 Closed 52 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC £2,548,872 Sept. 30, 2014 Sept. 29, 2016 Closed 53 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC £1,455,818 Sept. 30, 2016 June 29, 2019 Closed 54 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC £6,372,180 Sept. 30, 2014 Sept. 30, 2016 Closed 55 Process Intensification for Post-combustion Carbon Capture using Rotating Packed Bed through Systems Engineering Techniques EPSRC £3,639,545 Sept. 30, 2016 June 30, 2019 Closed 56 Carbon Capture from Power Plant and Atmosphere EPSRC £6,905,898 Sept. 30, 2008 March 30, 2014 Closed 57 Carbon Capture from Power Plant and Atmosphere EPSRC £17,264,745 Sept. 30, 2008 March 31, 2014 Closed 58 Study of Interacting Turbulent Flames Using Direct Numerical Simulation and Laser Diagnostics EPSRC £672,678 Sept. 30, 2008 March 30, 2012 Closed 59 High Hydrogen Content (HHC) Fuel Burning at High Pressure EPSRC £189,158 July 31, 2014 July 30, 2016 Closed 60 Study of Vitiated Turbulent Combustion for Low-Emission High-Efficiency Hybrid Energy Systems EPSRC £504,746 March 1, 2007 Feb. 28, 2010 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »