Home Projects More like: Unlocking the Potential of Model-Predictive Control in Non-domestic Building Energy Management: Automated Configuration and Optimisation of Control [Clear] # Title Funder Funding Start End Status 61 Energy Efficient Control EPSRC £858,214 Aug. 31, 2015 July 31, 2019 Closed 62 Nash equilibria for load balancing in networked power systems EPSRC £994,762 March 31, 2016 May 10, 2019 Closed 63 Nash equilibria for load balancing in networked power systems EPSRC £2,486,905 March 31, 2016 May 11, 2019 Closed 64 Evaluation and parameterisation of individual-based models of animal populations NERC £175,958 May 30, 2013 March 29, 2017 Closed 65 Evaluation and parameterisation of individual-based models of animal populations NERC £615,338 June 30, 2013 March 22, 2018 Closed 66 ACTIONS EPSRC £399,965 July 31, 2014 July 31, 2016 Closed 67 Advanced building façade design for optimal delivery of end use energy demand EPSRC £3,306,214 June 30, 2019 June 29, 2024 Active 68 Advanced building façade design for optimal delivery of end use energy demand EPSRC £8,265,535 June 30, 2019 June 30, 2024 Active 69 Resolving uncertainty in the thermal performance of natural fibre insulation materials. EPSRC £201,240 Nov. 1, 2012 April 29, 2014 Closed 70 Resolving uncertainty in the thermal performance of natural fibre insulation materials. EPSRC £503,100 Nov. 1, 2012 April 30, 2014 Closed 71 University of Bath - Equipment Account EPSRC £7,856,820 Aug. 4, 2013 Oct. 31, 2017 Closed 72 Addressing the SME Energy Challenge EPSRC £657,630 Oct. 31, 2014 Jan. 31, 2017 Closed 73 UK participation in IEA EBC Annex 79: Occupant behaviour-centric building design and operation EPSRC £132,475 Sept. 7, 2019 Sept. 7, 2024 Active 74 Refresh: Remodeling Building Design Sustainability from a Human Centered Approach EPSRC £3,388,700 June 30, 2013 Sept. 30, 2019 Closed 75 High-Rise Buildings: Energy and Density EPSRC £911,750 Nov. 1, 2015 March 31, 2017 Closed 76 Data driven approach to modelling the resource footprints of live data streams in digital twins EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »