# Title Funder Funding Start End Status
61 Energy Efficient Control EPSRC
£858,214
Aug. 31, 2015 July 31, 2019 Closed
62 Nash equilibria for load balancing in networked power systems EPSRC
£994,762
March 31, 2016 May 10, 2019 Closed
63 Nash equilibria for load balancing in networked power systems EPSRC
£2,486,905
March 31, 2016 May 11, 2019 Closed
64 Evaluation and parameterisation of individual-based models of animal populations NERC
£175,958
May 30, 2013 March 29, 2017 Closed
65 Evaluation and parameterisation of individual-based models of animal populations NERC
£615,338
June 30, 2013 March 22, 2018 Closed
66 ACTIONS EPSRC
£399,965
July 31, 2014 July 31, 2016 Closed
67 Advanced building façade design for optimal delivery of end use energy demand EPSRC
£3,306,214
June 30, 2019 June 29, 2024 Active
68 Advanced building façade design for optimal delivery of end use energy demand EPSRC
£8,265,535
June 30, 2019 June 30, 2024 Active
69 Resolving uncertainty in the thermal performance of natural fibre insulation materials. EPSRC
£201,240
Nov. 1, 2012 April 29, 2014 Closed
70 Resolving uncertainty in the thermal performance of natural fibre insulation materials. EPSRC
£503,100
Nov. 1, 2012 April 30, 2014 Closed
71 University of Bath - Equipment Account EPSRC
£7,856,820
Aug. 4, 2013 Oct. 31, 2017 Closed
72 Addressing the SME Energy Challenge EPSRC
£657,630
Oct. 31, 2014 Jan. 31, 2017 Closed
73 UK participation in IEA EBC Annex 79: Occupant behaviour-centric building design and operation EPSRC
£132,475
Sept. 7, 2019 Sept. 7, 2024 Active
74 Refresh: Remodeling Building Design Sustainability from a Human Centered Approach EPSRC
£3,388,700
June 30, 2013 Sept. 30, 2019 Closed
75 High-Rise Buildings: Energy and Density EPSRC
£911,750
Nov. 1, 2015 March 31, 2017 Closed
76 Data driven approach to modelling the resource footprints of live data streams in digital twins EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
Reset