Home Projects More like: Advanced Measurement, Modelling and Utilisation of Bouncing and Jumping Loading Induced by Groups and Crowds [Clear] # Title Funder Funding Start End Status 21 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 22 FloWTurb: Response of Tidal Energy Converters to Combined Tidal Flow, Waves, and Turbulence EPSRC £1,491,084 April 12, 2016 Oct. 31, 2019 Closed 23 Mixed-Mode Fatigue Crack Studies EPSRC £35,130 April 4, 2010 Sept. 3, 2010 Closed 24 Development of novel met-ocean analytical techniques to characterise turbulence. EPSRC £0 Aug. 31, 2019 Aug. 31, 2023 Closed 25 X-MED: EXtreme Loading of Marine Energy Devices due to Waves, Current, Flotsam and Mammal Impact EPSRC £1,802,754 Feb. 1, 2012 July 30, 2015 Closed 26 X-MED: EXtreme Loading of Marine Energy Devices due to Waves, Current, Flotsam and Mammal Impact EPSRC £4,506,885 Feb. 1, 2012 July 31, 2015 Closed 27 Structural Analysis and Optimisation of a Wave Energy Converter EPSRC £0 Aug. 31, 2019 Sept. 14, 2023 Closed 28 Dynamic Loadings on Turbines in a Tidal Array (DyLoTTA) EPSRC £1,607,090 June 30, 2016 March 30, 2020 Closed 29 Modelling Marine Renewable Energy Devices; Designing for Survivability EPSRC £5,198,085 June 29, 2012 Dec. 29, 2015 Closed 30 Design of Foundations and Anchors in Rock for Offshore Wind Energy Systems EPSRC £0 Sept. 30, 2022 Sept. 30, 2026 Active 31 Fatigue and damage tolerance of 3D-woven composites EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 32 4 year scholarship: year 1 PG Dip; year 2 PhD. PhD title: Quantifying Enhanced Mixing of Stratified Shelf Seas by Offshore Wind Infrastructure EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 33 Increasing the Life of Marine Turbines by Design and Innovation EPSRC £1,148,100 April 30, 2012 Oct. 31, 2015 Closed 34 Virtual Wave Structure Interaction (WSI) Simulation Environment EPSRC £1,616,720 Oct. 31, 2013 March 31, 2017 Closed 35 TAILORED COMPOSITES FOR TUNED DEFORMATION RESPONSE TO UNSTEADY FLUID LOADING EPSRC £849,508 May 22, 2011 Dec. 11, 2014 Closed 36 En-ComE: Energy Harvesting Powered Wireless Monitoring Systems Based on Integrated Smart Composite Structures and Energy-Aware Architecture EPSRC £1,260,578 April 14, 2014 Oct. 13, 2017 Closed 37 En-ComE: Energy Harvesting Powered Wireless Monitoring Systems Based on Integrated Smart Composite Structures and Energy-Aware Architecture EPSRC £3,151,445 April 14, 2014 Oct. 14, 2017 Closed 38 Performance of Ground Energy Systems Installed in Foundations EPSRC £2,388,720 Sept. 30, 2010 Sept. 30, 2014 Closed 39 Extreme Loading on FOWT under Complex Environmental Conditions EPSRC £706,310 Oct. 14, 2019 June 29, 2023 Active 40 Extreme Loading on FOWT under Complex Environmental Conditions EPSRC £1,765,775 Oct. 14, 2019 Feb. 29, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »