Home Projects More like: Enhanced Management and Performance for a Sustainable UK Energy Infrastructure [Clear] # Title Funder Funding Start End Status 21 Blockchain Enabled Vehicle to Local Grid (BEV2LG) Innovate UK £711,145 Feb. 1, 2018 March 31, 2019 Closed 22 Sustainable urban power supply through intelligent control and enhanced restoration of AC/DC networks EPSRC £3,022,805 March 31, 2020 March 31, 2024 Active 23 Sustainable urban power supply through intelligent control and enhanced restoration of AC/DC networks EPSRC £1,209,122 March 31, 2020 March 30, 2023 Active 24 Synchronisation Network for Monitoring of Low Voltage Electricity Networks SYNET Innovate UK £73,420 Aug. 31, 2012 Dec. 31, 2012 Closed 25 Synchronisation Network for Monitoring of Low Voltage Electricity Networks SYNET Innovate UK £29,368 Aug. 31, 2012 Dec. 31, 2012 Closed 26 Composite dielectric structures with enhanced lifetimes EPSRC £1,097,162 April 30, 2015 Oct. 31, 2018 Closed 27 Composite Dielectric Structures with Enhanced Lifetimes EPSRC £936,770 April 30, 2015 Oct. 31, 2018 Closed 28 Flexible and Efficient Power Plant: Flex-E-Plant EPSRC £5,991,000 July 31, 2013 Feb. 28, 2018 Closed 29 Flexible and Efficient Power Plant: Flex-E-Plant EPSRC £9,985,000 July 31, 2013 Feb. 28, 2018 Closed 30 EPSRC Centre for Doctoral Training in Power Networks at The University of Manchester EPSRC £8,062,080 March 31, 2014 March 30, 2023 Active 31 EPSRC Centre for Doctoral Training in Power Networks at The University of Manchester EPSRC £20,155,200 March 31, 2014 March 31, 2026 Active 32 Optimal Control of Electrical Storage EPSRC £0 Sept. 18, 2016 June 29, 2020 Closed 33 Optimal Control of Electrical Storage EPSRC £0 Sept. 30, 2016 June 30, 2020 Closed 34 MTVN: Multi-Terminal VSC-HVDC Networks - Grid Control EPSRC £1,069,724 Oct. 30, 2014 Oct. 28, 2017 Closed 35 MTVN: Multi-Terminal VSC-HVDC Networks - Grid Control EPSRC £2,674,310 Oct. 30, 2014 Oct. 29, 2017 Closed 36 Storm Risk Assessment of Interdependent Infrastructure Networks NERC £322,780 March 30, 2016 Sept. 29, 2017 Closed 37 Storm Risk Assessment of Interdependent Infrastructure Networks NERC £806,950 March 30, 2016 Sept. 30, 2017 Closed 38 Wide-Area Instrumentation of Power Networks using Existing Infrastructure EPSRC £826,760 June 30, 2016 June 29, 2019 Closed 39 Wide-Area Instrumentation of Power Networks using Existing Infrastructure EPSRC £2,066,900 June 30, 2016 June 30, 2019 Closed 40 Connect the unconnected: smart nanogrid management for peer-to-peer energy sharing Innovate UK £342,545 March 1, 2018 Aug. 31, 2018 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »