Home Projects More like: Measurement and verification of built assets: a low cost scalable solution to in-situ measurement of thermal performance [Clear] # Title Funder Funding Start End Status 61 Coherent detection and manipulation of terahertz quantum cascade lasers EPSRC £1,391,176 Sept. 30, 2011 Sept. 29, 2016 Closed 62 Low Energy and Sustainable Solutions Online kNowledge System (LESSONS) Innovate UK £673,680 March 31, 2010 March 31, 2013 Closed 63 Optimising phase change material use for energy-efficient buildings EPSRC £0 Sept. 30, 2017 April 29, 2022 Active 64 Electrodes by Design - Microstructural Engineering of High Performance Electrodes for Solid Oxide Fuel Cells EPSRC £2,494,730 April 30, 2015 Oct. 31, 2018 Closed 65 Electrodes by Design - Microstructural Engineering of High Performance Electrodes for Solid Oxide Fuel Cells EPSRC £6,236,825 April 30, 2015 Oct. 31, 2018 Closed 66 Virtual district heating, small projects come in from the cold. Feasibility Study Innovate UK £49,899 Sept. 30, 2022 March 30, 2023 Active 67 Virtual district heating, small projects come in from the cold. Feasibility Study Innovate UK £249,495 Sept. 30, 2022 June 30, 2023 Closed 68 Design of novel, additively manufactured cellular lattice supported composite structures using topology optimisation EPSRC £0 Sept. 30, 2019 Jan. 31, 2024 Active 69 Local indicators and potential for Electrification of heat with a focus on multi-vector integration including hydrogen EPSRC £0 Sept. 27, 2020 Sept. 26, 2021 Closed 70 Local indicators and potential for Electrification of heat with a focus on multi-vector integration including hydrogen EPSRC £0 Sept. 30, 2020 Sept. 27, 2021 Closed 71 Thermal Memory House AHRC, Innovate UK £490,000 Sept. 30, 2011 March 31, 2013 Closed 72 Bloca - Sustainable Building Blocks Innovate UK £105,096 Jan. 1, 2021 June 29, 2021 Closed 73 Bloca - Sustainable Building Blocks Innovate UK £262,740 Jan. 1, 2021 June 30, 2021 Closed 74 Optimization of Thermally Driven Building Cooling Systems EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 75 Optimization of Thermally Driven Building Cooling Systems EPSRC £0 Sept. 30, 2019 Dec. 31, 2023 Closed 76 Collaborative knowledge-based DfMA approach to build cost-efficient, low-impact and high performance houses Innovate UK £1,433,670 March 1, 2019 Feb. 28, 2021 Closed 77 Collaborative knowledge-based DfMA approach to build cost-efficient, low-impact and high performance houses ISCF £3,584,175 March 1, 2019 Feb. 28, 2021 Closed 78 Advanced building façade design for optimal delivery of end use energy demand EPSRC £3,306,214 June 30, 2019 June 29, 2024 Active 79 Advanced building façade design for optimal delivery of end use energy demand EPSRC £8,265,535 June 30, 2019 June 30, 2024 Active 80 A whole-life approach to the development of high integrity welding technologies for Generation IV fast reactors EPSRC £5,122,740 June 29, 2014 Dec. 31, 2020 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »