# Title Funder Funding Start End Status
21 High Performance Room Temperature Thermoelectric Oxide Materials by Controlling Nanostructure EPSRC
£142,628
Nov. 4, 2011 Nov. 3, 2014 Closed
22 Engineering of Carbon-Oxide Composite Thermoelectric Nanomaterials EPSRC
£0
Sept. 30, 2019 Sept. 29, 2022 Active
23 Heat Pump Fully Integrated with Thermochemical Store (HP-FITS) EPSRC
£2,594,834
Sept. 30, 2020 Sept. 29, 2024 Active
24 Heat Pump Fully Integrated with Thermochemical Store (HP-FITS) EPSRC
£6,487,085
Sept. 30, 2020 Sept. 30, 2024 Active
25 Intelligent Grid Interfaced Vehicle Eco-charging (iGIVE) EPSRC
£1,710,220
Dec. 1, 2013 July 30, 2017 Closed
26 Intelligent Grid Interfaced Vehicle Eco-charging (iGIVE) EPSRC
£4,275,550
Dec. 1, 2013 July 31, 2017 Closed
27 FITS-LCD: Fabric Integrated Thermal Storage for Low-Carbon Dwellings EPSRC
£1,997,756
March 31, 2016 March 31, 2019 Closed
28 FITS-LCD: Fabric Integrated Thermal Storage for Low-Carbon Dwellings EPSRC
£4,994,390
March 31, 2016 March 31, 2019 Closed
29 GigaWatt-Hour Subsurface Thermal Energy storAge: Engineered structures and legacy Mine shafts: STEaM EPSRC
£978,269
Aug. 12, 2022 Aug. 11, 2024 Active
30 GigaWatt-Hour Subsurface Thermal Energy storAge: Engineered structures and legacy Mine shafts: STEaM EPSRC
£215,571
June 30, 2022 June 29, 2024 Active
31 GigaWatt-Hour Subsurface Thermal Energy storAge: Engineered structures and legacy Mine shafts: STEaM EPSRC
£4,891,345
Aug. 12, 2022 Feb. 12, 2025 Active
32 Co-benefits of energy networks integration technologies for system operation EPSRC, NERC
£0
Sept. 30, 2018 March 31, 2023 Closed
33 TGA/FTIR as a Core Equipment for Delivering Research on Energy System Compound Stability EPSRC
£199,806
Feb. 12, 2020 Aug. 10, 2021 Closed
34 TGA/FTIR as a Core Equipment for Delivering Research on Energy System Compound Stability EPSRC
£499,515
Feb. 12, 2020 Aug. 11, 2021 Closed
35 MultidiSciplinary and MultIscale approach for coupLed processes induced by geo-Energies UKRI
£265,251
Jan. 1, 2023 Dec. 31, 2026 Active
36 MultidiSciplinary and MultIscale approach for coupLed processes induced by geo-Energies Horizon Europe Guarantee
£1,326,255
March 31, 2023 March 31, 2027 Active
37 Joint UK-India Clean Energy Centre (JUICE) EPSRC
£10,188,872
Sept. 30, 2016 March 30, 2022 Closed
38 Joint UK-India Clean Energy Centre (JUICE) Newton Fund
£25,472,180
Sept. 30, 2016 March 31, 2022 Closed
39 Energy Storage for Low Carbon Grids EPSRC
£11,242,032
Sept. 30, 2012 June 29, 2018 Closed
40 Energy Storage for Low Carbon Grids EPSRC
£28,105,080
Sept. 30, 2012 June 30, 2018 Closed
Reset