Home Projects More like: The University of Birmingham and Blue Sky Bio Limited [Clear] # Title Funder Funding Start End Status 1 New microporous polymers for carbon dioxide selective membranes EPSRC £772,782 March 1, 2013 Dec. 31, 2013 Closed 2 New microporous polymers for carbon dioxide selective membranes EPSRC £1,440,450 Jan. 1, 2014 Feb. 29, 2016 Closed 3 New microporous polymers for carbon dioxide selective membranes EPSRC £1,931,955 March 1, 2013 Dec. 31, 2013 Closed 4 Novel multi-scale 3D/4D characterization of pore networks in tight rocks: Enhanced understanding of clean gas extraction and safe carbon sequestration NERC £742,912 Jan. 1, 2018 Dec. 31, 2022 Active 5 Selective Exhaust Gas Recirculation for Carbon Capture with Gas Turbines: Integration, Intensification, Scale-up and Optimisation. EPSRC £2,199,782 Dec. 1, 2014 May 30, 2018 Closed 6 Selective Exhaust Gas Recirculation for Carbon Capture with Gas Turbines: Integration, Intensification, Scale-up and Optimisation. EPSRC £5,499,455 Dec. 1, 2014 May 31, 2018 Closed 7 Hydrogen fuel gas Detection with novel Raman Analyser (HYDRA) Innovate UK £119,756 Sept. 30, 2020 Dec. 31, 2020 Closed 8 Improving Gas Network Infrastructure Planning Innovate UK £392,834 June 30, 2017 March 31, 2019 Closed 9 Improving Gas Network Infrastructure Planning ISCF £982,085 June 30, 2017 March 31, 2019 Closed 10 The University of Birmingham and Blue Sky Bio Limited Innovate UK £656,290 April 30, 2015 Oct. 31, 2017 Closed 11 Multi-wavelength tunable lasers for gas spectroscopy EPSRC £776,428 Sept. 30, 2010 March 30, 2014 Closed 12 Multi-wavelength tunable lasers for gas spectroscopy EPSRC £1,036,256 Sept. 30, 2010 Sept. 29, 2014 Closed 13 Project Centurion Feasibility Study Innovate UK £445,595 Sept. 30, 2018 March 30, 2020 Closed 14 Project Centurion Feasibility Study Innovate UK £1,115,550 Sept. 30, 2018 March 31, 2020 Closed 15 Zero-Carbon Emission Integrated Cooling, Heating and Power (ICHP) Networks EPSRC £2,303,080 June 30, 2021 June 29, 2024 Active 16 Zero-Carbon Emission Integrated Cooling, Heating and Power (ICHP) Networks EPSRC £5,757,700 June 30, 2021 March 31, 2025 Active 17 Understanding and Improving Electrochemical Carbon Capture by Supercapacitors EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 18 Sustainable Bioconversion of CO2 to Polyhydroxyalkanoates Biopolymer by Anaerobic Mixed Bacteria in a Single-Stage Gas Fermentation (CO2BIOPOL) UKRI £204,031 Sept. 26, 2022 Sept. 25, 2024 Active 19 Sustainable gas pathways for Brazil; from microcosm to macrocosm NERC £1,972,666 April 30, 2016 Oct. 31, 2019 Closed 20 Perennial Biomass Crops for Greenhouse Gas Removal BBSRC £7,817,660 April 30, 2021 Oct. 31, 2025 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »