Home Projects More like: Combining advanced simulation and manufacturing of Combining advanced simulation and manufacturing of Combining advanced simulation and manufacturing [Clear] # Title Funder Funding Start End Status 81 High Reliability Engine Generator (HiREG) Innovate UK £843,306 March 31, 2014 March 30, 2016 Closed 82 Effects of biofuel blending components on combustion properties and emissions from heavy duty engines EPSRC, NERC £0 Sept. 30, 2018 Dec. 31, 2022 Closed 83 Fast modelling of wavy wind turbine trailing edge for reducing noise and power loss EPSRC £0 Sept. 30, 2022 March 30, 2026 Active 84 SAMULET Programme: High Efficiency Turbomachinery Project 1 Innovate UK £8,631,200 Jan. 1, 2009 March 31, 2013 Closed 85 Experimental measurements of the effect of hot gas ingestion on rotor discs EPSRC £199,372 Jan. 2, 2014 Jan. 1, 2016 Closed 86 IMPLANT - Advanced Materials and Manufacturing for Improved Power and Process Plant Performance Innovate UK £1,825,308 Jan. 1, 2020 March 30, 2023 Active 87 PRISM: Platform for Research In Simulation Methods EPSRC £8,064,825 June 30, 2018 Dec. 31, 2023 Active 88 Thermally Augmented Cork-based Thin Insulation Coating (TACTIC) Innovate UK £301,100 Sept. 30, 2020 June 29, 2021 Closed 89 Thermally Augmented Cork-based Thin Insulation Coating (TACTIC) Innovate UK £752,750 Sept. 30, 2020 June 30, 2021 Closed 90 Building new collaborations to develop highly radiation resistant materials for fusion power EPSRC £205,210 March 31, 2023 March 31, 2024 Active 91 Self-optimised Robotic simulation and off-line programming tool for non-destructive testing of advanced composite structure Innovate UK £123,855 April 30, 2012 July 31, 2012 Closed 92 Advanced Powertrain With Energy Storage (APWES) Innovate UK £8,311,516 April 30, 2017 June 29, 2021 Closed 93 Modelling and Simulation of Intermittent Flows EPSRC £826,947 March 1, 2007 Feb. 28, 2010 Closed 94 Modelling and Simulation of Intermittent Flows EPSRC £552,404 June 17, 2007 June 16, 2010 Closed 95 A Cost-Effective Regenerative Air Hybrid Powertrain for Low Carbon Buses and Delivery Vehicles EPSRC £729,540 March 31, 2011 June 29, 2014 Closed 96 A Cost-Effective Regenerative Air Hybrid Powertrain for Low Carbon Buses and Delivery Vehicles EPSRC £224,592 May 31, 2011 May 30, 2014 Closed 97 Fundamental study of biofuel combustion: flame stabilisation and emissions using advanced optical diagnostics EPSRC £687,572 Aug. 31, 2019 Aug. 30, 2020 Closed 98 Fundamental study of biofuel combustion: flame stabilisation and emissions using advanced optical diagnostics EPSRC £489,554 Dec. 1, 2020 Feb. 28, 2023 Active 99 Fundamental study of biofuel combustion: flame stabilisation and emissions using advanced optical diagnostics EPSRC £1,718,930 Aug. 31, 2019 Aug. 31, 2020 Closed 100 Fundamental study of biofuel combustion: flame stabilisation and emissions using advanced optical diagnostics EPSRC £1,223,885 Dec. 1, 2020 Feb. 28, 2023 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »