Home Projects More like: Sum-of-Squares Approach to Global Stability and Control of Fluid Flows [Clear] # Title Funder Funding Start End Status 41 Advanced Instability Methods (AIM) Network EPSRC £161,248 Jan. 29, 2009 Sept. 29, 2011 Closed 42 Adaptive multilevel stochastic collocation methods for uncertainty quantification EPSRC £282,305 Dec. 1, 2021 Nov. 30, 2022 Closed 43 Effects of turbulent flow conditions on performance of wind and tidal turbines EPSRC £0 Jan. 1, 2018 June 29, 2021 Closed 44 Effects of turbulent flow conditions on performance of wind and tidal turbines EPSRC £0 Jan. 1, 2018 June 30, 2021 Closed 45 Three-dimensionality and Instabilities of Leading-Edge Vortices EPSRC £847,968 Sept. 1, 2019 Aug. 31, 2022 Closed 46 Three dimensionality and Instabilities of Leading-Edge Vortices EPSRC £899,610 Sept. 30, 2019 Sept. 29, 2022 Active 47 Geothermal Power Generated from UK Granites (GWatt) NERC £1,249,368 Jan. 2, 2019 June 30, 2023 Active 48 Geothermal Power Generated from UK Granites (GWatt) NERC £1,039,216 Jan. 2, 2019 June 30, 2023 Active 49 Geothermal Power Generated from UK Granites (GWatt) NERC £2,598,040 Jan. 2, 2019 July 1, 2023 Closed 50 Geothermal Power Generated from UK Granites (GWatt) NERC £3,123,420 Jan. 2, 2019 July 1, 2023 Closed 51 Geothermal Power Generated from UK Granites (GWatt) NERC £1,302,924 Jan. 2, 2019 June 30, 2023 Active 52 Geothermal Power Generated from UK Granites (GWatt) NERC £2,172,706 Jan. 2, 2019 July 1, 2023 Closed 53 Platform: Underpinning Technologies for Finite Element Simulation EPSRC £2,574,718 Nov. 1, 2013 Oct. 31, 2018 Closed 54 Non-linear stability of inverter-dominated power grids EPSRC £0 Sept. 30, 2022 March 30, 2026 Active 55 Experimental study of atmospheric stratification in environmental flows (StratEnFlo) EPSRC £189,260 Nov. 1, 2016 Oct. 31, 2018 Closed 56 Experimental study of atmospheric stratification in environmental flows (StratEnFlo) EPSRC £473,150 Nov. 1, 2016 Oct. 31, 2018 Closed 57 Three Theoretical Problems in the Control of Rotating Machines EPSRC £454,604 June 30, 2007 June 29, 2010 Closed 58 Active Control of Turbulent Flow Separation by Surface Plasma EPSRC £377,676 Jan. 1, 2006 Dec. 31, 2008 Closed 59 Next generation curved deployable flexible booms for high precision applications EPSRC £1,060,155 Aug. 5, 2018 Feb. 5, 2021 Closed 60 Experimental investigation of the effect of coherent secondary structures upon a tip vortex EPSRC £198,030 Sept. 8, 2010 March 8, 2013 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »