Home Projects More like: Instrumentation Ready Gearbox [Clear] # Title Funder Funding Start End Status 61 Wake anemometry for yaw error correction: feasibility and risk evaluation. Innovate UK £172,542 May 31, 2015 Nov. 30, 2015 Closed 62 Holistic Subsea Cable Fault Detection & Condition Monitoring System Innovate UK £1,858,337 April 30, 2021 Dec. 31, 2022 Active 63 Metricity Innovate UK £182,794 Nov. 1, 2013 March 30, 2014 Closed 64 Metricity Innovate UK £456,985 Nov. 1, 2013 March 31, 2014 Closed 65 wind turbines EPSRC £0 Sept. 30, 2016 Sept. 29, 2020 Closed 66 Renewable Energy Array Cable and Termination Instrumentation using Optical sensor Networks (REACTION) Innovate UK £370,240 Feb. 1, 2019 July 30, 2020 Closed 67 Renewable Energy Array Cable and Termination Instrumentation using Optical sensor Networks (REACTION) Innovate UK £925,600 Feb. 1, 2019 July 31, 2020 Closed 68 Data-driven Optimisation of Offshore Wind Operations & Maintenance EPSRC £0 Aug. 31, 2021 Aug. 31, 2025 Active 69 proof of market potentials and economics of a state of the art condition monitoring technology for wind turbine applications Innovate UK £50,000 Aug. 31, 2015 Feb. 29, 2016 Closed 70 proof of market potentials and economics of a state of the art condition monitoring technology for wind turbine applications Innovate UK £125,000 Aug. 31, 2015 Feb. 29, 2016 Closed 71 The MPSE SeaAngel Programme: Project 4 Offshore Marine Engineering Innovate UK £9,965,976 March 31, 2010 Dec. 31, 2015 Closed 72 The MPSE SeaAngel Programme: Project 1 Digital Displacement Transmission Design and Validation Innovate UK £18,543,684 March 31, 2010 Dec. 31, 2015 Closed 73 The MPSE SeaAngel Programme: Project 1 Digital Displacement Transmission Design and Validation Innovate UK £30,906,140 March 31, 2010 Dec. 31, 2015 Closed 74 The MPSE SeaAngel Programme: Project 4 Offshore Marine Engineering Innovate UK £16,609,960 March 31, 2010 Dec. 31, 2015 Closed 75 Feasibility Assessment of ReliaWind Condition Monitoring Technology for Offshore Wind Turbine Drivetrains Innovate UK £192,852 April 30, 2013 Feb. 28, 2014 Closed 76 Feasibility Assessment of ReliaWind Condition Monitoring Technology for Offshore Wind Turbine Drivetrains Innovate UK £482,130 April 30, 2013 Feb. 28, 2014 Closed 77 Evance 15kW Ultra Low Noise Wind Turbine Innovate UK £200,000 Jan. 1, 2012 Dec. 31, 2012 Closed 78 Evance 15kW Ultra Low Noise Wind Turbine Innovate UK, NERC £500,000 Jan. 1, 2012 Dec. 31, 2012 Closed 79 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £2,580,280 June 30, 2021 June 29, 2026 Active 80 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £6,450,700 June 30, 2021 June 30, 2026 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »