Home Projects More like: Proof of market for a novel coloured carbon fibre composite [Clear] # Title Funder Funding Start End Status 41 Braided thermoplastic composites characterisation and modelling Innovate UK £10,911 Sept. 30, 2022 March 30, 2023 Active 42 Understanding the fatigue behavior of tidal turbine blades EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 43 Understanding the fatigue behavior of tidal turbine blades EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 44 Developing liquid acrylic resin-based composites for marine renewable energy and ship building applications EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 45 Developing liquid acrylic resin-based composites for marine renewable energy and ship building applications EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 46 Electrolyte matrix materials for structural battery composites EPSRC £0 Sept. 29, 2019 Sept. 29, 2023 Active 47 Heterogeneous Fibre Optic sensor Arrays to Monitor Composite Manufacture (H-FOAM) EPSRC £1,011,752 June 30, 2022 June 29, 2025 Active 48 Heterogeneous Fibre Optic sensor Arrays to Monitor Composite Manufacture (H-FOAM) EPSRC £5,058,760 Jan. 1, 2023 Dec. 31, 2025 Active 49 Development of multiscale modelling methodology for the discovery and design of composite materials EPSRC £0 Sept. 22, 2019 Sept. 29, 2023 Active 50 Development of multiscale modelling methodology for the discovery and design of composite materials EPSRC £0 Sept. 30, 2019 Sept. 30, 2023 Closed 51 Manufacture, characterisation, and optimisation of WrapToR stiffened skin panels for aerospace applications EPSRC £0 Sept. 22, 2019 March 30, 2024 Active 52 Pressure efficient tape wound hYDROgen storage (PYDRO) Innovate UK £195,187 Sept. 30, 2022 Sept. 29, 2023 Active 53 Pressure efficient tape wound hYDROgen storage (PYDRO) Innovate UK £975,935 Sept. 30, 2022 Sept. 30, 2023 Closed 54 Advanced Non-Destructive Testing of Blade Manufacturing Defects EPSRC, NERC £0 Sept. 30, 2018 Dec. 31, 2022 Closed 55 EPSRC Centre for Doctoral Training in Composites Science, Engineering and Manufacturing EPSRC £12,807,510 Sept. 30, 2019 March 30, 2028 Active 56 Micromechanical assessment of structural batteries EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 57 Light Weight Large Diameter Bolts for Safer Wind Turbine Maintenance Innovate UK £49,062 July 31, 2013 Nov. 30, 2013 Closed 58 Light Weight Large Diameter Bolts for Safer Wind Turbine Maintenance Innovate UK £122,655 July 31, 2013 Nov. 30, 2013 Closed 59 Transformation from a linear single-use tooling board to a circular multi-use product Innovate UK £48,554 Nov. 1, 2022 April 29, 2023 Active 60 Prediction of the performance of structural power composites EPSRC £0 Sept. 30, 2017 March 30, 2022 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »