Home Projects More like: Upgrading woody biomass to biocoal using a novel microwave induced plasma technology [Clear] # Title Funder Funding Start End Status 21 Liquid Fuel and bioEnergy Supply from CO2 Reduction EPSRC £9,621,480 March 1, 2016 June 30, 2020 Closed 22 Measurement and Analysis of bioenergy greenhouse gases: Integrating GHGs into LCAs and the UK Biomass Value Chain Modelling Environment (MAGLUE) EPSRC £4,968,920 March 1, 2015 Aug. 31, 2018 Closed 23 Energy gardens for small-scale farmers in Nepal: institutions, species and technology ESRC £156,744 Sept. 30, 2013 March 30, 2015 Closed 24 Energy gardens for small-scale farmers in Nepal: institutions, species and technology ESRC £391,860 Sept. 30, 2013 March 31, 2015 Closed 25 From atoms to plant: co-production of green transport fuel and levoglucosan from waste biomass EPSRC £155,328 June 30, 2019 Sept. 13, 2020 Closed 26 From atoms to plant: co-production of green transport fuel and levoglucosan from waste biomass EPSRC £201,968 March 1, 2019 June 29, 2019 Closed 27 From atoms to plant: co-production of green transport fuel and levoglucosan from waste biomass EPSRC £504,920 March 1, 2019 June 30, 2019 Closed 28 From atoms to plant: co-production of green transport fuel and levoglucosan from waste biomass EPSRC £388,320 June 30, 2019 Sept. 14, 2020 Closed 29 Flexible Routes to Liquid Fuels from CO2 by Advanced Catalysis and Engineering EPSRC £3,608,530 March 30, 2016 Sept. 29, 2020 Closed 30 Flexible Routes to Liquid Fuels from CO2 by Advanced Catalysis and Engineering EPSRC £9,021,325 March 30, 2016 Sept. 30, 2020 Closed 31 Sustainable Materials for Balloons EPSRC £0 Oct. 2, 2022 March 30, 2026 Active 32 Understanding the barriers to the introduction and uptake of clean/improved cookstoves in Southern Africa EPSRC £1,370,810 Sept. 30, 2013 March 30, 2017 Closed 33 Understanding the barriers to the introduction and uptake of clean/improved cookstoves in Southern Africa EPSRC £3,427,025 Sept. 30, 2013 March 31, 2017 Closed 34 Bio-fabrication of sustainable functional bacterial cellulose aerogel for building insulation EPSRC £1,249,070 June 11, 2023 June 11, 2025 Active 35 Co-benefits and trade-offs of bioenergy with carbon capture and storage - the role of feedstock sustainability BBSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 36 TGA/FTIR as a Core Equipment for Delivering Research on Energy System Compound Stability EPSRC £199,806 Feb. 12, 2020 Aug. 10, 2021 Closed 37 TGA/FTIR as a Core Equipment for Delivering Research on Energy System Compound Stability EPSRC £499,515 Feb. 12, 2020 Aug. 11, 2021 Closed 38 Biomass Derived Transport Fuels via Fischer-Tropsch Synthesis EPSRC £0 March 31, 2016 Dec. 30, 2019 Closed 39 Development and Integration of Biomass and Concentrating Photovoltaic System for Rural and Urban Energy Bridge: BioCPV EPSRC £2,803,272 Nov. 1, 2011 Jan. 31, 2013 Closed 40 Development and Integration of Biomass and Concentrating Photovoltaic System for Rural and Urban Energy Bridge: BioCPV EPSRC £2,037,252 Feb. 1, 2013 July 8, 2016 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »