Home Projects More like: CMMI-EPSRC RENACEM: Response to CO2 exposure of concrete with natural supplementary cementitious materials [Clear] # Title Funder Funding Start End Status 1 CMMI-EPSRC RENACEM: Response to CO2 exposure of concrete with natural supplementary cementitious materials EPSRC £2,248,215 Jan. 1, 2020 June 30, 2023 Closed 2 Bulk Use of Biomass and Co-fired Ash in Novel Binders NERC £141,106 April 21, 2013 Oct. 20, 2013 Closed 3 Bulk Use of Biomass and Co-fired Ash in Novel Binders NERC £352,765 April 21, 2013 Oct. 21, 2013 Closed 4 Increasing the early age strength of High Volume Fly Ash (HVFA) concrete EPSRC £195,514 Sept. 9, 2012 March 9, 2015 Closed 5 Durable Low Carbon Reinforced Concrete for Challenging Environments (DULCET) Innovate UK £668,054 Feb. 1, 2022 July 30, 2023 Active 6 The valorization of contaminated waste glass to produce locally sourced, low-carbon cement at the Cemex Rugby cement plant Innovate UK £2,572,820 Sept. 30, 2022 Sept. 29, 2024 Active 7 Multi-scale engineering of alkali-activated concretes for sustainable infrastructure EPSRC £2,560,536 June 28, 2018 Jan. 26, 2024 Active 8 Direct CO2 Capture EPSRC £612,160 Nov. 1, 2015 Dec. 31, 2016 Closed 9 An Electrochemical Approach to Study Carbonation of Novel Lime Based Materials EPSRC £276,912 Oct. 14, 2010 Jan. 31, 2014 Closed 10 LIMES.NET: Network for Low Impact Materials and innovative Engineering Solutions for the built environment EPSRC £449,858 Aug. 31, 2011 Sept. 29, 2012 Closed 11 LIMES.NET: Network for Low Impact Materials and innovative Engineering Solutions for the built environment EPSRC £1,124,645 Aug. 31, 2011 Sept. 30, 2012 Closed 12 In Situ Incubation and Filtration System for the Pelagic Ocean (InSIncFS) NERC £749,223 Nov. 7, 2022 July 5, 2024 Active 13 Sustainable Urban Carbon Capture: Engineering Soils for Climate Change (SUCCESS) EPSRC £3,796,800 May 31, 2014 Sept. 30, 2017 Closed 14 Investigation of thermo-mechanical performance of PCM incorporated Geothermal Energy Pile (PCMinGEEP) EPSRC £428,708 Nov. 1, 2019 Oct. 31, 2022 Active 15 Investigation of thermo-mechanical performance of PCM incorporated Geothermal Energy Pile (PCMinGEEP) EPSRC £1,071,770 Nov. 1, 2019 Oct. 31, 2022 Closed 16 Greenhouse Gas Removal in the Iron and Steel Industry NERC £1,218,345 July 31, 2017 Dec. 31, 2018 Closed 17 Greenhouse Gas Removal in the Iron and Steel Industry NERC £1,529,580 Jan. 25, 2019 June 30, 2022 Closed 18 Recycling of FRP wind blade waste material in concrete EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 19 Integrating graphene into concrete and ceramic tiles for smart cities EPSRC, NERC £0 Sept. 30, 2018 Dec. 30, 2022 Closed 20 Natural Structural Materials: Super Tall Timber EPSRC £493,174 Sept. 27, 2015 Sept. 26, 2017 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 »