# Title Funder Funding Start End Status
1 CMMI-EPSRC RENACEM: Response to CO2 exposure of concrete with natural supplementary cementitious materials EPSRC
£2,248,215
Jan. 1, 2020 June 30, 2023 Closed
2 Bulk Use of Biomass and Co-fired Ash in Novel Binders NERC
£141,106
April 21, 2013 Oct. 20, 2013 Closed
3 Bulk Use of Biomass and Co-fired Ash in Novel Binders NERC
£352,765
April 21, 2013 Oct. 21, 2013 Closed
4 Increasing the early age strength of High Volume Fly Ash (HVFA) concrete EPSRC
£195,514
Sept. 9, 2012 March 9, 2015 Closed
5 Durable Low Carbon Reinforced Concrete for Challenging Environments (DULCET) Innovate UK
£668,054
Feb. 1, 2022 July 30, 2023 Active
6 The valorization of contaminated waste glass to produce locally sourced, low-carbon cement at the Cemex Rugby cement plant Innovate UK
£2,572,820
Sept. 30, 2022 Sept. 29, 2024 Active
7 Multi-scale engineering of alkali-activated concretes for sustainable infrastructure EPSRC
£2,560,536
June 28, 2018 Jan. 26, 2024 Active
8 Direct CO2 Capture EPSRC
£612,160
Nov. 1, 2015 Dec. 31, 2016 Closed
9 An Electrochemical Approach to Study Carbonation of Novel Lime Based Materials EPSRC
£276,912
Oct. 14, 2010 Jan. 31, 2014 Closed
10 LIMES.NET: Network for Low Impact Materials and innovative Engineering Solutions for the built environment EPSRC
£449,858
Aug. 31, 2011 Sept. 29, 2012 Closed
11 LIMES.NET: Network for Low Impact Materials and innovative Engineering Solutions for the built environment EPSRC
£1,124,645
Aug. 31, 2011 Sept. 30, 2012 Closed
12 In Situ Incubation and Filtration System for the Pelagic Ocean (InSIncFS) NERC
£749,223
Nov. 7, 2022 July 5, 2024 Active
13 Sustainable Urban Carbon Capture: Engineering Soils for Climate Change (SUCCESS) EPSRC
£3,796,800
May 31, 2014 Sept. 30, 2017 Closed
14 Investigation of thermo-mechanical performance of PCM incorporated Geothermal Energy Pile (PCMinGEEP) EPSRC
£428,708
Nov. 1, 2019 Oct. 31, 2022 Active
15 Investigation of thermo-mechanical performance of PCM incorporated Geothermal Energy Pile (PCMinGEEP) EPSRC
£1,071,770
Nov. 1, 2019 Oct. 31, 2022 Closed
16 Greenhouse Gas Removal in the Iron and Steel Industry NERC
£1,218,345
July 31, 2017 Dec. 31, 2018 Closed
17 Greenhouse Gas Removal in the Iron and Steel Industry NERC
£1,529,580
Jan. 25, 2019 June 30, 2022 Closed
18 Recycling of FRP wind blade waste material in concrete EPSRC
£0
Sept. 30, 2020 Sept. 30, 2024 Active
19 Integrating graphene into concrete and ceramic tiles for smart cities EPSRC, NERC
£0
Sept. 30, 2018 Dec. 30, 2022 Closed
20 Natural Structural Materials: Super Tall Timber EPSRC
£493,174
Sept. 27, 2015 Sept. 26, 2017 Closed
Reset