Home Projects More like: CABLEHEAL [Clear] # Title Funder Funding Start End Status 1 CableCare 2: Self-repair Subsea Cable Demonstrator Innovate UK £2,490,045 Dec. 1, 2018 Nov. 30, 2021 Closed 2 Link Box Monitoring Innovate UK £326,764 March 1, 2020 Feb. 28, 2022 Closed 3 CableDyn: Subsea Power Cable Dynamics Under Complex Ocean Environment EPSRC £2,449,800 March 1, 2022 May 30, 2025 Active 4 CableDyn: Subsea Power Cable Dynamics Under Complex Ocean Environment EPSRC £6,124,500 May 31, 2022 May 31, 2025 Active 5 Advanced Materials and Manufacture of High Voltage AC and DC Power Cables for Deepwater Offshore Wind Applications Innovate UK £339,241 Dec. 1, 2022 Nov. 30, 2024 Active 6 Advanced Materials and Manufacture of High Voltage AC and DC Power Cables for Deepwater Offshore Wind Applications Innovate UK £1,696,205 Dec. 1, 2022 Nov. 30, 2024 Active 7 Sustainable Power Cable Materials Technologies with Improved Whole Life Performance EPSRC £384,312 Sept. 30, 2008 Dec. 31, 2010 Closed 8 Sustainable Power Cable Materials Technologies with Improved Whole Life Performance EPSRC £960,780 Sept. 30, 2008 Dec. 31, 2010 Closed 9 Holistic Subsea Cable Fault Detection & Condition Monitoring System Innovate UK £1,858,337 April 30, 2021 Dec. 31, 2022 Active 10 Motions and loads on dynamic export cables for floating Offshore Renewable Energy farms using physical and numerical modelling. EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 11 Energy Transfer for Offshore Wind Energy EPSRC £0 Sept. 30, 2022 Sept. 29, 2025 Active 12 Energy Transfer for Offshore Wind Energy EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 13 Vortex-induced vibrations (VIV) assessment of subsea power cables and mooring lines of offshore renewable energy converters EPSRC £0 Aug. 31, 2020 Feb. 29, 2024 Active 14 Vortex-induced vibrations (VIV) assessment of subsea power cables and mooring lines of offshore renewable energy converters EPSRC £0 Aug. 31, 2020 Feb. 29, 2024 Active 15 MOSAIC (Monitoring, Scanning and Active Inspection of Cables) Innovate UK £985,508 Dec. 1, 2013 Nov. 30, 2016 Closed 16 Dynamic stressing of subsea cable insulation for floating offshore wind applications EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 17 Low carbon damage resistance concrete for roads EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 18 The development of a 220kV ac subsea cable repair joint Innovate UK £550,950 Nov. 1, 2019 Jan. 31, 2021 Closed 19 The development of a 220kV ac subsea cable repair joint Innovate UK £1,377,375 Nov. 1, 2019 Jan. 31, 2021 Closed 20 An Automated Pull-in and Lock-Off System for Offshore Wind Farm Cable Installation Innovate UK £90,884 Dec. 1, 2017 May 30, 2018 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »