Home Projects More like: Development of Geobacillus thermoglucosidasius as a robust platform for production of chemicals from renewables through modelling and experimentation [Clear] # Title Funder Funding Start End Status 81 Algal oils by design: a new biotech platform for high-value lipids. BBSRC £11,819,640 Jan. 1, 2014 Dec. 31, 2018 Closed 82 Does an ancient circadian clock control transcriptional rhythms using a non-transcriptional oscillator? BBSRC £1,538,374 Sept. 30, 2012 Jan. 31, 2016 Closed 83 Does an ancient circadian clock control transcriptional rhythms using a non-transcriptional oscillator? BBSRC £3,845,935 Sept. 30, 2012 Jan. 31, 2016 Closed 84 Microbial carbon cycling under geological CO2 storage conditions: understanding the rules of life in the engineered subsurface BBSRC £1,934,810 Jan. 1, 2022 Dec. 31, 2026 Active 85 Microbial carbon cycling under geological CO2 storage conditions: understanding the rules of life in the engineered subsurface BBSRC £4,837,025 Jan. 1, 2022 Dec. 31, 2026 Active 86 [16- FAPESP-BE] An integrated approach to explore a novel paradigm for biofuel production from lignocellulosic feedstocks BBSRC £2,982,050 March 1, 2017 March 30, 2022 Closed 87 [16- FAPESP-BE] An integrated approach to explore a novel paradigm for biofuel production from lignocellulosic feedstocks BBSRC £7,455,125 March 1, 2017 March 31, 2022 Closed 88 19-ERACoBioTech: Sustainable Production of n-Butanol by Artificial Consortia Through Synthetic and Systems Biology Approaches (SynConsor4Butonal) BBSRC £773,566 Aug. 31, 2020 Aug. 30, 2023 Active 89 19-ERACoBioTech: Sustainable Production of n-Butanol by Artificial Consortia Through Synthetic and Systems Biology Approaches (SynConsor4Butonal) BBSRC £1,933,915 Aug. 31, 2020 March 31, 2024 Active 90 Assessment of Integrated Microalgal-Bacterial Ecosystems for Bioenergy Production - Optimization-based Methodology EPSRC £198,762 Feb. 1, 2012 Jan. 31, 2013 Closed 91 Assessment of Integrated Microalgal-Bacterial Ecosystems for Bioenergy Production - Optimization-based Methodology EPSRC £496,905 Feb. 1, 2012 Jan. 31, 2013 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »