Home Projects More like: Plasma Synthetic Jet Actuators for the Control of Transonic Shock Wave Boundary Layer Interaction [Clear] # Title Funder Funding Start End Status 21 Spectral Broadening in Aeroacoustics EPSRC £646,934 May 31, 2013 Nov. 30, 2016 Closed 22 CBET-EPSRC: Turbulent flows over multiscale heterogeneous surfaces EPSRC £978,776 Dec. 1, 2017 Nov. 30, 2022 Active 23 CBET-EPSRC: Turbulent flows over multiscale heterogeneous surfaces EPSRC £2,446,940 Dec. 1, 2017 Nov. 30, 2022 Closed 24 QUIET AEROFOILS OF THE NEXT GENERATION EPSRC £575,330 April 30, 2016 Dec. 31, 2018 Closed 25 QUIET AEROFOILS OF THE NEXT GENERATION EPSRC £1,438,325 April 30, 2016 Dec. 31, 2018 Closed 26 TEAM-A: The tailored electromagnetic and acoustic materials accelerator EPSRC £4,866,388 Sept. 30, 2017 March 30, 2023 Active 27 TEAM-A: The tailored electromagnetic and acoustic materials accelerator UUI £12,184,240 Sept. 30, 2017 March 31, 2023 Closed 28 Control of a swept-wing boundary layer perturbed by free-stre am turbulence EPSRC £199,660 Oct. 13, 2011 April 12, 2013 Closed 29 Rare-events in turbulent fluid flow EPSRC £0 Sept. 30, 2019 April 10, 2024 Active 30 Plasma-actuator controlled turbulent jets EPSRC £193,294 Aug. 31, 2015 Aug. 30, 2017 Closed 31 Investigation of the Mechanism of the Bacterial Flagellar Motor BBSRC £686,434 March 30, 2007 March 29, 2010 Closed 32 CBET-EPSRC: Transition and Turbulence in Compressible Boundary Layers Subjected to Concave Surface Curvature EPSRC £692,374 Jan. 11, 2021 Jan. 10, 2024 Active 33 Improving Turbine Efficiency by Combining the Effects of Rim Seals and End-wall Contours in the Presence of Purge Flow EPSRC £1,674,934 Sept. 30, 2015 March 31, 2019 Closed 34 Secondary currents in turbulent flows over rough walls EPSRC £2,322,576 March 31, 2021 March 30, 2025 Active 35 Control of boundary layer streaks induced by free-stream turbulence using a novel velocity-pressure control framework. EPSRC £748,790 Aug. 31, 2011 Aug. 30, 2014 Closed 36 Active Vibration Control of Parametrically Excited Systems EPSRC £494,920 April 29, 2013 April 29, 2015 Closed 37 Uncertainty and risk in the development of additive manufacturing produced structures in the aerospace industry EPSRC, NERC £0 Sept. 30, 2017 Dec. 31, 2021 Closed 38 Three-dimensionality and Instabilities of Leading-Edge Vortices EPSRC £847,968 Sept. 1, 2019 Aug. 31, 2022 Closed 39 International Collaboration Sabbatical: To Foster Long-term Collaboration with Leading Control and Power Electronics Experts in the USA EPSRC £212,250 April 9, 2012 April 29, 2013 Closed 40 International Collaboration Sabbatical: To Foster Long-term Collaboration with Leading Control and Power Electronics Experts in the USA EPSRC £286,666 Jan. 16, 2012 April 8, 2012 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »