Home Projects More like: Market Size assessment for HF radar wave measurement systems [Clear] # Title Funder Funding Start End Status 81 Automation and Optimisation of Wavelet Transform Techniques for Partial Discharge Denoising, and Pulse Shape Classification, in Power Plant EPSRC £353,456 Feb. 13, 2006 Aug. 30, 2006 Closed 82 SUPERGEN Energy Storage Hub EPSRC £7,824,840 June 29, 2014 Dec. 29, 2019 Closed 83 SUPERGEN Energy Storage Hub EPSRC £19,562,100 June 29, 2014 Dec. 29, 2019 Closed 84 Ecological Coastal Protection that Generates Electricity Innovate UK £124,995 Sept. 30, 2017 March 31, 2018 Closed 85 Neptune: a space-stabilised offshore access system Innovate UK £200,000 March 1, 2012 Aug. 30, 2013 Closed 86 Toward an Industrial Strength Automatic Differentiation Product EPSRC £202,930 Nov. 1, 2012 Jan. 31, 2014 Closed 87 The Kelp System Innovate UK £48,878 Nov. 1, 2022 April 29, 2023 Active 88 In-situ Chemical Measurement and Imaging Diagnostics for Energy Process Engineering EPSRC £2,047,030 Sept. 30, 2016 Sept. 29, 2021 Closed 89 Next generation coastal protection with Bio-based Electrochemical Artificial Reefs(BEARs) Innovate UK £976,515 Sept. 30, 2022 Oct. 31, 2024 Active 90 FloWTurb: Response of Tidal Energy Converters to Combined Tidal Flow, Waves, and Turbulence EPSRC £1,491,084 April 12, 2016 Oct. 31, 2019 Closed 91 Measuring and Evaluating the Travel, Physical Activity and Carbon Impacts of Connect2 EPSRC £4,500,564 May 4, 2008 Nov. 4, 2013 Closed 92 Seaweed biorefinery feasibility project: producing high-value fucoidan from ocean-farmed seaweed biomass for sustainable and resilient net zero UK supply chains Innovate UK £49,166 Nov. 1, 2022 Feb. 28, 2023 Active 93 Waves Across Shore Platforms EPSRC £1,321,115 Aug. 31, 2014 Feb. 28, 2017 Closed 94 Sandscaping for Mitigating Coastal Flood and Erosion Risk to Energy Infrastructure on Gravel Shorelines: a case study approach NERC £92,420 Oct. 9, 2014 April 8, 2015 Closed 95 Sandscaping for Mitigating Coastal Flood and Erosion Risk to Energy Infrastructure on Gravel Shorelines: a case study approach NERC £231,050 Oct. 9, 2014 April 9, 2015 Closed 96 Sediment transport processes in vegetated canopies under full-scale wave conditions EPSRC £0 Aug. 31, 2017 Aug. 31, 2020 Closed 97 Engineering with Nature: combining Artificial intelligence, Remote sensing and computer Models for the optimum design of coastal protection schemes EPSRC £1,522,438 Nov. 1, 2021 Oct. 31, 2026 Active 98 Design Software for Flexible Structures in Waves (FlexWEC) Innovate UK £137,068 Nov. 1, 2019 July 30, 2021 Closed 99 Design Software for Flexible Structures in Waves (FlexWEC) Innovate UK £342,670 Nov. 1, 2019 July 31, 2021 Closed 100 Standardisation of a Thermal Memory System - STORM Innovate UK £220,668 Nov. 1, 2019 Jan. 31, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »