Home Projects More like: Reliable Low Power Embedded Computing Systems (ROPEUST) [Clear] # Title Funder Funding Start End Status 41 2010 Grant Balance - University of Surrey. EPSRC £419,045 Sept. 30, 2011 March 31, 2012 Closed 42 Investigation of Technologies for Fault Level Management in Future Distribution Networks EPSRC, NERC £0 Sept. 30, 2017 Feb. 28, 2022 Closed 43 Renewable Energy Array Cable and Termination Instrumentation using Optical sensor Networks (REACTION) Innovate UK £370,240 Feb. 1, 2019 July 30, 2020 Closed 44 Renewable Energy Array Cable and Termination Instrumentation using Optical sensor Networks (REACTION) Innovate UK £925,600 Feb. 1, 2019 July 31, 2020 Closed 45 Mitigating the effect of low inertia and low short-circuit level in HVDC-rich AC grids EPSRC £591,264 Dec. 15, 2014 April 29, 2018 Closed 46 Mitigating the effect of low inertia and low short-circuit level in HVDC-rich AC grids EPSRC £1,478,160 Dec. 15, 2014 April 30, 2018 Closed 47 Wide-Area Instrumentation of Power Networks using Existing Infrastructure EPSRC £826,760 June 30, 2016 June 29, 2019 Closed 48 Wide-Area Instrumentation of Power Networks using Existing Infrastructure EPSRC £2,066,900 June 30, 2016 June 30, 2019 Closed 49 Vertical GaN-on-Si membrane power transistors: Efficient power electronics for mass-market applications (VertiGaN)` EPSRC £1,315,124 Sept. 30, 2023 Feb. 28, 2027 Active 50 Modelling Accelerated Ageing and Degradation of Solid Oxide Fuel Cells (MAAD-SOFC) EPSRC £1,149,632 Oct. 2, 2011 Aug. 30, 2015 Closed 51 Modelling Accelerated Ageing and Degradation of Solid Oxide Fuel Cells (MAAD-SOFC) EPSRC £2,874,080 Oct. 2, 2011 Aug. 31, 2015 Closed 52 Novel Sub-Threshold Methodologies for GaN Electronic Devices: A Study of Device Reliability and Degradation Mechanisms EPSRC £829,312 April 30, 2011 Oct. 31, 2015 Closed 53 Plug and play fault-tolerant control EPSRC £0 Sept. 30, 2016 March 31, 2020 Closed 54 Plug and play fault-tolerant control EPSRC £0 Sept. 30, 2016 March 30, 2020 Closed 55 Thermally-Aware Power Distribution Networks for Vertically Integrated Systems EPSRC £1,002,546 March 31, 2015 Nov. 30, 2018 Closed 56 Thermally-Aware Power Distribution Networks for Vertically Integrated Systems EPSRC £2,506,365 March 31, 2015 Nov. 30, 2018 Closed 57 RHYTHM: Resilient Hybrid Technology for High-Value Microgrids EPSRC £1,970,486 June 30, 2016 March 31, 2019 Closed 58 RHYTHM: Resilient Hybrid Technology for High-Value Microgrids EPSRC £4,926,215 June 30, 2016 March 31, 2019 Closed 59 BattCon - Battery Containerised Test Facility Innovate UK £317,096 Nov. 1, 2020 May 30, 2021 Closed 60 BattCon - Battery Containerised Test Facility Innovate UK £1,585,480 Nov. 1, 2020 May 31, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »