Home Projects More like: Utility of LOV-based Fluorescent Reporters To Monitor the Real-Time Secretion and Localisation of Bacterial Effector Proteins [Clear] # Title Funder Funding Start End Status 81 In vivo alpha-olefin production: a sustainable hydrocarbon source BBSRC £3,032,055 Aug. 31, 2013 Dec. 31, 2016 Closed 82 Bilateral NSF/BIO-BBSRC: Synthetic DNA Nanopores for Selective Transmembrane Transport BBSRC £818,874 Nov. 30, 2016 May 30, 2020 Closed 83 Bilateral NSF/BIO-BBSRC: Synthetic DNA Nanopores for Selective Transmembrane Transport BBSRC £2,047,185 Nov. 30, 2016 May 31, 2020 Closed 84 The role of CESA protein modification in localisation and function of the cellulose synthase complex BBSRC £855,736 Nov. 1, 2010 April 29, 2014 Closed 85 A new pathway for iron-sulfur cluster repair BBSRC £1,803,010 May 29, 2014 May 29, 2017 Closed 86 The molecular interface of microbe-mineral electron transfer BBSRC £710,084 Sept. 29, 2014 Dec. 31, 2017 Closed 87 14 NSFBIO:Identifying Mechanisms for Environmental Adaptation in CMNR Bacteria: A Systems Analysis of GeneRegulation of AlternativeSubstrateMetabolism BBSRC £850,736 Sept. 30, 2015 Sept. 29, 2019 Closed 88 14 NSFBIO:Identifying Mechanisms for Environmental Adaptation in CMNR Bacteria: A Systems Analysis of GeneRegulation of AlternativeSubstrateMetabolism BBSRC £2,126,840 Sept. 30, 2015 Sept. 30, 2019 Closed 89 How do multi-heme cytochromes form transmembrane wires and conduct electrons between the cell and environment? BBSRC £691,270 May 9, 2010 May 8, 2013 Closed 90 How E. coli produces hydrogen BBSRC £634,088 Jan. 16, 2012 Sept. 14, 2015 Closed 91 How E. coli produces hydrogen BBSRC £708,816 Jan. 9, 2012 Jan. 8, 2015 Closed 92 Design and construction of electrogenic cell-based biosensors for pathogens and toxins BBSRC £956,060 Nov. 30, 2013 Nov. 29, 2017 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »