Home Projects More like: High-temperature Silicon Carbide Electronics (HITSIC) [Clear] # Title Funder Funding Start End Status 61 Zirconium boride coatings for ultra high temperature composites and solar power generators Innovate UK £99,365 May 31, 2015 Sept. 30, 2015 Closed 62 Increasing resource efficiency in the silicon carbide power market Innovate UK £50,000 March 31, 2022 March 30, 2023 Active 63 Design, build and testing of a 50 kVA SiC BJT inverter as a building block for high-power HVDC inverters EPSRC £417,522 Aug. 31, 2014 May 30, 2016 Closed 64 Design, build and testing of a 50 kVA SiC BJT inverter as a building block for high-power HVDC inverters EPSRC £104,080 Aug. 24, 2016 Nov. 24, 2016 Closed 65 Design, build and testing of a 50 kVA SiC BJT inverter as a building block for high-power HVDC inverters EPSRC £1,043,805 Aug. 31, 2014 May 31, 2016 Closed 66 Design, build and testing of a 50 kVA SiC BJT inverter as a building block for high-power HVDC inverters EPSRC £260,200 Aug. 24, 2016 Nov. 24, 2016 Closed 67 CORSICA: Navigating at will the siliCOn-caRbon phaSe dIagram via maChine leArning EPSRC £0 Sept. 30, 2018 Sept. 29, 2022 Active 68 Predictive Reliability Modelling and Characterization of Silicon Carbide Power MOS-Transistors in Grid-Connected Voltage Source Converters EPSRC £199,530 April 16, 2013 Aug. 15, 2015 Closed 69 Predictive Reliability Modelling and Characterization of Silicon Carbide Power MOS-Transistors in Grid-Connected Voltage Source Converters EPSRC £498,825 April 16, 2013 Aug. 16, 2015 Closed 70 SAGE (self-aligned gate electronics) Innovate UK £199,974 March 1, 2012 Feb. 28, 2013 Closed 71 SAGE (self-aligned gate electronics) AHRC, Innovate UK £499,935 March 1, 2012 Feb. 28, 2013 Closed 72 Diamond based pressure sensors for high temperature harsh environments EPSRC £496,680 Feb. 28, 2013 Feb. 27, 2015 Closed 73 HI-IMPERATIVE (Highly Innovative Thermally Conductive Materials for Power-Electronics Applications in EV) Innovate UK £770,102 June 30, 2021 Dec. 31, 2022 Active 74 Reliability, Condition Monitoring and Health Management Technologies for WBG Power Modules EPSRC £2,436,242 Sept. 30, 2017 Dec. 31, 2021 Closed 75 Reliability, Condition Monitoring and Health Management Technologies for WBG Power Modules EPSRC £6,090,605 Sept. 30, 2017 Dec. 31, 2021 Closed 76 High-Bandwidth Sensing for Wide-bandgap Power Conversion EPSRC £1,150,662 July 31, 2022 July 30, 2027 Active 77 High-Bandwidth Sensing for Wide-bandgap Power Conversion EPSRC £5,753,310 Feb. 1, 2023 Sept. 30, 2028 Active 78 @FutureBEV Innovate UK £15,023,184 July 31, 2020 Jan. 31, 2024 Active 79 Design, simulation and fabrication of silicon carbide IGBTs - 1=Information and communication technologies (ICT) 2=Non CMOS Device Technology EPSRC £0 Oct. 1, 2017 Sept. 29, 2021 Closed 80 Design, simulation and fabrication of silicon carbide IGBTs - 1=Information and communication technologies (ICT) 2=Non CMOS Device Technology EPSRC £0 Oct. 1, 2017 Sept. 30, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »