More like:
ENPOWER [Clear]

# Title Funder Funding Start End Status
81 Composite structural housing with integrated thermal management EPSRC
£0
Sept. 19, 2021 Sept. 29, 2025 Active
82 Composite structural housing with integrated thermal management EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
83 A whole-life approach to the development of high integrity welding technologies for Generation IV fast reactors EPSRC
£5,122,740
June 29, 2014 Dec. 31, 2020 Closed
84 ESRC RCUK Innovation Fellowships ESRC
£684,908
March 31, 2018 March 30, 2021 Closed
85 INSPIRE - Integrated Sustainable Production through Innovative Resource Efficiency Innovate UK
£1,186,819
Aug. 31, 2022 Aug. 30, 2024 Active
86 EPSRC Centre for Doctoral Training in Power Networks at The University of Manchester EPSRC
£8,062,080
March 31, 2014 March 30, 2023 Active
87 EPSRC Centre for Doctoral Training in Power Networks at The University of Manchester EPSRC
£20,155,200
March 31, 2014 March 31, 2026 Active
88 Thermally-Aware Power Distribution Networks for Vertically Integrated Systems EPSRC
£1,002,546
March 31, 2015 Nov. 30, 2018 Closed
89 Thermally-Aware Power Distribution Networks for Vertically Integrated Systems EPSRC
£2,506,365
March 31, 2015 Nov. 30, 2018 Closed
90 Productizing Microfluidic Technology for Real-time Lubricating Oil Analysis on Wind Turbines Innovate UK
£245,740
June 30, 2018 Dec. 31, 2019 Closed
91 Productizing Microfluidic Technology for Real-time Lubricating Oil Analysis on Wind Turbines Innovate UK
£614,350
June 30, 2018 Dec. 31, 2019 Closed
92 Power-Adaptive Computing: Run-Time Management Design on FPGA SoC Devices EPSRC
£0
Sept. 30, 2017 Nov. 30, 2021 Closed
93 Power-Adaptive Computing: Run-Time Management Design on FPGA SoC Devices EPSRC, NERC
£0
Sept. 30, 2017 Nov. 30, 2021 Closed
94 FNR - Fundamentals of Negative Capacitance: Towards New Low Power Electronics EPSRC
£929,720
March 31, 2019 March 30, 2023 Active
95 FNR - Fundamentals of Negative Capacitance: Towards New Low Power Electronics EPSRC
£2,324,300
March 31, 2019 June 30, 2023 Closed
96 Integrating advanced nanomaterials into transformative technologies EPSRC
£2,074,324
Sept. 30, 2010 Sept. 29, 2015 Closed
97 Control Interface for QUantum Integrated Technology Arrays EPSRC
£1,943,648
Sept. 30, 2020 Sept. 29, 2023 Active
98 Optimization of readout and gates for a superconducting fluxonium qubit EPSRC
£0
Sept. 20, 2020 Sept. 19, 2024 Active
99 Optimization of readout and gates for a superconducting fluxonium qubit EPSRC
£0
Sept. 20, 2020 Sept. 20, 2024 Active
100 Strategic Partnership in Computational Science for Advanced Simulation and Modelling of Engineering Systems - ASiMoV EPSRC
£12,655,320
Sept. 30, 2018 March 31, 2024 Active
Reset