Home Projects More like: Evaluation of beta-Ga2O3 for high power RF device applications [Clear] # Title Funder Funding Start End Status 1 Multi-Domain Virtual Prototyping Techniques for Wide-Bandgap Power Electronics EPSRC £2,158,516 Nov. 24, 2017 Nov. 23, 2021 Closed 2 Multi-Domain Virtual Prototyping Techniques for Wide-Bandgap Power Electronics EPSRC £5,396,290 Nov. 24, 2017 Nov. 23, 2021 Closed 3 Van der Waals Ga2O3 functional materials epitaxy: Revolutionary power electronics EPSRC £201,458 Nov. 1, 2022 April 29, 2024 Active 4 Van der Waals Ga2O3 functional materials epitaxy: Revolutionary power electronics EPSRC £1,007,290 April 30, 2023 Oct. 31, 2024 Active 5 Ga2O3 electronics for zero carbon emission technologies EPSRC £0 Sept. 19, 2021 March 30, 2025 Active 6 Ga2O3 electronics for zero carbon emission technologies EPSRC £0 Sept. 30, 2021 March 31, 2025 Active 7 Converter Architectures EPSRC £2,518,800 Nov. 1, 2017 Oct. 30, 2021 Closed 8 Converter Architectures EPSRC £6,297,000 Nov. 1, 2017 Oct. 31, 2021 Closed 9 Insulation degradation and lifetime of inverter-fed machines with fast switching (high dv/dt) converters EPSRC £2,398,464 Nov. 1, 2018 Oct. 31, 2022 Active 10 Insulation degradation and lifetime of inverter-fed machines with fast switching (high dv/dt) converters EPSRC £5,996,160 Nov. 1, 2018 Oct. 31, 2022 Closed 11 Underpinning Power Electronics 2017: Heterogeneous Integration EPSRC £2,709,924 Nov. 1, 2017 April 28, 2022 Closed 12 Underpinning Power Electronics 2017: Heterogeneous Integration EPSRC £6,774,810 Nov. 1, 2017 April 29, 2022 Closed 13 High Frequency Power Conversion Using Wide Band-Gap Semiconductors EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 14 Reliability, Condition Monitoring and Health Management Technologies for WBG Power Modules EPSRC £2,436,242 Sept. 30, 2017 Dec. 31, 2021 Closed 15 Reliability, Condition Monitoring and Health Management Technologies for WBG Power Modules EPSRC £6,090,605 Sept. 30, 2017 Dec. 31, 2021 Closed 16 Development of an Application Interface for Wide Bandgap Semiconductor Simulation Tool Innovate UK £249,215 May 31, 2023 Nov. 30, 2023 Active 17 Integration of Lithium Batteries to Improve Reliability and Power Density of WBG-based Medium Voltage Direct Current Converters EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 18 Integration of Lithium Batteries to Improve Reliability and Power Density of WBG-based Medium Voltage Direct Current Converters EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 19 FINER: Future thermal Imaging with Nanometre Enhanced Resolution EPSRC £1,382,156 Sept. 30, 2021 July 30, 2025 Active 20 Development of Silicon Carbide devices for next generation surge protection circuitry and power electronics EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »