# Title Funder Funding Start End Status
1 RF Power Systems and Optimized RF structures for electron beam acceleration STFC
£122,622
Jan. 19, 2018 June 29, 2018 Closed
2 RF Power Systems and Optimized RF structures for electron beam acceleration GCRF
£306,555
Jan. 19, 2018 June 30, 2018 Closed
3 Harmonic and higher order mode mm-wave klystrons STFC
£143,366
Feb. 1, 2013 Jan. 31, 2014 Closed
4 Harmonic and higher order mode mm-wave klystrons STFC
£87,540
Feb. 1, 2013 Jan. 31, 2014 Closed
5 EPSRC Centre for Doctoral Training in Graphene Technology EPSRC
£9,534,772
March 31, 2014 March 30, 2023 Active
6 Control Interface for QUantum Integrated Technology Arrays EPSRC
£1,943,648
Sept. 30, 2020 Sept. 29, 2023 Active
7 DTP 2018-19 University of Glasgow EPSRC
£12,626,971
Sept. 30, 2018 Sept. 29, 2023 Active
8 DTP 2018-19 University of Glasgow EPSRC
£31,755,000
Sept. 30, 2018 Sept. 30, 2023 Closed
9 The use of thin film functional materials in optoelectronic framework applications EPSRC
£0
Sept. 30, 2016 March 1, 2021 Closed
10 Computational Modelling of Rotating Cavity Flows EPSRC
£0
Sept. 30, 2018 June 29, 2022 Active
11 Novel NMR methodologies using DC SQUIDs applied to fundamental condensed matter physics and biodiagnostics EPSRC
£1,161,950
Sept. 30, 2007 Sept. 29, 2012 Closed
12 SYnthesizing 3D METAmaterials for RF, microwave and THz applications (SYMETA) EPSRC
£8,025,654
March 1, 2016 Feb. 28, 2021 Closed
13 SYnthesizing 3D METAmaterials for RF, microwave and THz applications (SYMETA) EPSRC
£20,064,135
March 1, 2016 Feb. 28, 2021 Closed
14 Characterising Flow Regimes and Transitions, Heat Transport and Energy/Enstrophy Cascades in Rapidly Rotating Thermal Convection EPSRC
£492,081
Sept. 30, 2022 Sept. 29, 2025 Active
15 Understanding RF Gel Formation: modelling fundamental nanoscale processes for enhanced materials development EPSRC
£0
Sept. 30, 2017 Sept. 29, 2021 Closed
16 Energy and the Physical Sciences: Novel multi-seeded bulk superconductors for sustainable engineering applications EPSRC
£945,050
Sept. 30, 2013 Sept. 29, 2016 Closed
17 THE FUTURE COMPOSITES MANUFACTURING HUB EPSRC
£54,153,955
Jan. 1, 2017 June 30, 2024 Active
18 Development and commercialisation of dual resist technologies for fabrication in compound semi-conductors Innovate UK
£607,460
Nov. 1, 2020 April 29, 2022 Closed
19 Development and commercialisation of dual resist technologies for fabrication in compound semi-conductors Innovate UK
£1,427,845
Nov. 1, 2020 April 30, 2022 Closed
20 EPSRC Centre for Doctoral Training in Composites Science, Engineering and Manufacturing EPSRC
£12,807,510
Sept. 30, 2019 March 30, 2028 Active
Reset