# Title Funder Funding Start End Status
1 ZEFAL The Zero Fault Level Generator for Active Urban Networks EPSRC
£156,042
March 31, 2008 March 30, 2010 Closed
2 ZEFAL The Zero Fault Level Generator for Active Urban Networks EPSRC
£390,105
March 31, 2008 March 31, 2010 Closed
3 ZEFAL The Zero Fault Level Generator for Active Urban Networks EPSRC
£702,980
May 31, 2008 May 31, 2010 Closed
4 Investigation of Technologies for Fault Level Management in Future Distribution Networks EPSRC, NERC
£0
Sept. 30, 2017 Feb. 28, 2022 Closed
5 Multilevel Inverter Topologies for MVDC EPSRC
£0
Dec. 1, 2017 May 30, 2021 Closed
6 Multilevel Inverter Topologies for MVDC EPSRC
£0
Dec. 1, 2017 May 31, 2021 Closed
7 ESCO Box: Smart monitoring, billing and control for pro-poor access to energy services EPSRC
£1,687,884
Aug. 31, 2013 Jan. 31, 2017 Closed
8 ESCO Box: Smart monitoring, billing and control for pro-poor access to energy services EPSRC
£4,219,710
Aug. 31, 2013 Jan. 31, 2017 Closed
9 Novel Core Technlogies for Highly Compact Fault Current Limiters EPSRC
£0
Sept. 30, 2018 March 30, 2022 Active
10 Novel Core Technlogies for Highly Compact Fault Current Limiters EPSRC
£0
Sept. 30, 2018 March 31, 2022 Closed
11 Sustainable urban power supply through intelligent control and enhanced restoration of AC/DC networks EPSRC
£3,022,805
March 31, 2020 March 31, 2024 Active
12 Sustainable urban power supply through intelligent control and enhanced restoration of AC/DC networks EPSRC
£1,209,122
March 31, 2020 March 30, 2023 Active
13 Forecasting Climate Change Impacts on Urban Electricity Distribution Network Loads Innovate UK
£1,216,550
June 30, 2015 June 30, 2017 Closed
14 Forecasting Climate Change Impacts on Urban Electricity Distribution Network Loads Innovate UK
£486,620
June 30, 2015 June 29, 2017 Closed
15 Technology Transformation to Support Flexible and Resilient Local Energy Systems EPSRC
£1,617,516
June 30, 2020 Sept. 29, 2023 Active
16 Technology Transformation to Support Flexible and Resilient Local Energy Systems EPSRC
£4,043,790
June 30, 2020 Sept. 30, 2023 Closed
17 Enhanced Renewable Integration through Flexible Transmission Options (ERIFT) EPSRC
£1,760,862
March 31, 2013 March 30, 2016 Closed
18 Enhanced Renewable Integration through Flexible Transmission Options (ERIFT) EPSRC
£4,402,155
March 31, 2013 March 31, 2016 Closed
19 66kV Collector Interface for HVDC Innovate UK
£123,770
June 30, 2013 March 30, 2014 Closed
20 66kV Collector Interface for HVDC Innovate UK
£309,425
June 30, 2013 March 31, 2014 Closed
Reset