# Title Funder Funding Start End Status
61 Future Everyday Interaction with the Autonomous Internet of Things EPSRC
£3,661,850
Dec. 21, 2016 Oct. 31, 2019 Closed
62 Resistive switches (RRAM) and memristive behaviour in silicon-rich silicon oxides EPSRC
£1,932,564
May 31, 2013 Aug. 30, 2017 Closed
63 Do hunger neuropeptides mediate the link between caloric restriction and lifespan extension? BBSRC
£1,224,406
May 31, 2009 Nov. 30, 2012 Closed
64 Do hunger neuropeptides mediate the link between caloric restriction and lifespan extension? BBSRC
£3,061,015
May 31, 2009 Nov. 30, 2012 Closed
65 Realistic fault modelling to enable optimization of low power IoT and Cognitive fault-tolerant computing systems EPSRC
£892,480
Jan. 1, 2021 Dec. 31, 2023 Active
66 Developing environmentally sustainable best practices for human brain imaging MRC
£500,655
Oct. 13, 2022 Jan. 2, 2024 Active
67 Imaging Membrane Potential via Second Harmonic Generation EPSRC
£1,578,386
Aug. 31, 2010 Aug. 30, 2014 Closed
68 Regulation of synaptic inhibition by GABAA receptor trafficking under normal conditions and in neurological and neuropsy MRC
£3,867,586
Sept. 30, 2009 Jan. 31, 2015 Closed
69 Green adaptive control for future interconnected vehicles EPSRC
£8,344,235
March 31, 2016 Aug. 31, 2019 Closed
70 MICA: The role of excitatory synaptic scaling in epileptogenesis in rodent and human brain networks MRC
£970,701
Aug. 31, 2022 Aug. 30, 2025 Active
71 SAMI-2: two-dimensional Doppler imaging of tokamak plasmas EPSRC
£1,065,280
Jan. 1, 2019 May 31, 2021 Closed
72 Neuroanatomical and functional characterization of hindbrain leucine-sensing circuits implicated in the regulation of feeding behaviour MRC
£805,066
Dec. 1, 2015 Sept. 2, 2018 Closed
73 Automation and Contemplation for Model Adaptation in Multiagent Interactions EPSRC
£402,654
March 31, 2019 March 30, 2021 Closed
74 Automation and Contemplation for Model Adaptation in Multiagent Interactions EPSRC
£1,006,635
March 31, 2019 March 31, 2021 Closed
75 Optical detection of magnetisation dynamics induced by spin-orbit torques EPSRC
£1,044,668
Feb. 27, 2017 Sept. 29, 2021 Closed
76 Transfer Optimisation System for Adaptive Automated Nature-Inspired Optimisation FLF
£5,488,210
April 30, 2019 April 30, 2023 Closed
77 SERT: Scale-free, Energy-aware, Resilient and Transparent Adaptation of CSE Applications to Mega-core Systems EPSRC
£1,927,856
March 31, 2015 Sept. 29, 2018 Closed
78 SERT: Scale-free, Energy-aware, Resilient and Transparent Adaptation of CSE Applications to Mega-core Systems EPSRC
£4,819,640
March 31, 2015 Sept. 30, 2018 Closed
79 Accelerated Real-Time Information Extraction System (ARIES) EPSRC
£505,046
Sept. 30, 2012 Sept. 29, 2013 Closed
80 Accelerated Real-Time Information Extraction System (ARIES) EPSRC
£1,262,615
Sept. 30, 2012 Sept. 30, 2013 Closed
Reset