Home Projects More like: Masterplanning for Low Carbon Buildings [Clear] # Title Funder Funding Start End Status 81 Zero Carbon Lithium Extraction from Geothermal Fluid Innovate UK £846,440 Nov. 1, 2020 March 31, 2021 Closed 82 Deployment of ultrasonic melt flow enhancement technology to achieve energy savings of 27% across the energy intensive, injection moulded consumer packaging sector Innovate UK £5,542,770 March 1, 2022 Feb. 29, 2024 Active 83 Deployment of ultrasonic melt flow enhancement technology to achieve energy savings of 27% across the energy intensive, injection moulded food packaging sector Innovate UK £5,127,380 March 1, 2022 Feb. 29, 2024 Active 84 Transformation of the Top and Tail of Energy Networks EPSRC £8,264,142 Sept. 30, 2011 Sept. 29, 2015 Closed 85 Transformation of the Top and Tail of Energy Networks EPSRC £20,660,355 Sept. 30, 2011 Sept. 30, 2015 Closed 86 LIMES.NET: Network for Low Impact Materials and innovative Engineering Solutions for the built environment EPSRC £449,858 Aug. 31, 2011 Sept. 29, 2012 Closed 87 LIMES.NET: Network for Low Impact Materials and innovative Engineering Solutions for the built environment EPSRC £1,124,645 Aug. 31, 2011 Sept. 30, 2012 Closed 88 Electric vehicle suitability and infrastructure procurement software Innovate UK £728,745 Sept. 30, 2020 Aug. 31, 2021 Closed 89 High-Bandwidth Sensing for Wide-bandgap Power Conversion EPSRC £1,150,662 July 31, 2022 July 30, 2027 Active 90 High-Bandwidth Sensing for Wide-bandgap Power Conversion EPSRC £5,753,310 Feb. 1, 2023 Sept. 30, 2028 Active 91 Structural integrity characterisation of nuclear materials via nano additive manufacturing EPSRC £1,008,735 March 20, 2017 Sept. 19, 2018 Closed 92 Building Expertise: A System of Professions Approach to Low-Carbon Housing Refurbishment EPSRC £746,428 Aug. 31, 2010 Feb. 28, 2014 Closed 93 Building Expertise: A System of Professions Approach to Low-Carbon Housing Refurbishment EPSRC £1,866,070 Aug. 31, 2010 Feb. 28, 2014 Closed 94 Towards net-zero carbon buildings: tackling uncertainty when predicting the carbon footprint of construction products and whole buildings EPSRC £688,802 Aug. 15, 2021 Feb. 15, 2024 Active 95 eViz - Energy Visualisation for Carbon Reduction EPSRC £545,644 Sept. 2, 2012 Feb. 29, 2016 Closed 96 eViz EPSRC £376,998 Dec. 31, 2012 Aug. 30, 2015 Closed 97 eViz - Energy Visualisation for Carbon Reduction EPSRC £257,578 Nov. 1, 2012 April 29, 2016 Closed 98 eViz - Energy Visualisation for Carbon Reduction EPSRC £1,817,492 Aug. 31, 2012 Feb. 29, 2016 Closed 99 eViz - Energy Visualisation for Carbon Reduction EPSRC £4,543,730 Aug. 31, 2012 Feb. 29, 2016 Closed 100 Daybreak Innovate UK £1,999,980 June 30, 2020 Sept. 30, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »