# Title Funder Funding Start End Status
61 In situ time-dependent characterisation of corrosion processes in nuclear waste storage and GDF environments EPSRC
£3,730,075
Sept. 30, 2011 Sept. 30, 2015 Closed
62 Simultaneous Corrosion/Irradiation Testing in Lead and Lead-Bismuth Eutectic: The Radiation Decelerated Corrosion Hypothesis (RC-3) EPSRC
£1,086,628
Jan. 1, 2020 Dec. 31, 2023 Active
63 Simultaneous Corrosion/Irradiation Testing in Lead and Lead-Bismuth Eutectic: The Radiation Decelerated Corrosion Hypothesis (RC-3) EPSRC
£2,716,570
Jan. 1, 2020 Sept. 30, 2024 Active
64 Development of Reef Cubes for biodiversity enhancement of rock placement and carbon sequestration Innovate UK
£118,868
Sept. 30, 2020 Dec. 31, 2020 Closed
65 Development of Reef Cubes for biodiversity enhancement of rock placement and carbon sequestration Innovate UK
£297,170
Sept. 30, 2020 Dec. 31, 2020 Closed
66 Porcement. Recylcing Tiles into a concete alternative. Innovate UK
£592,125
July 31, 2023 July 31, 2024 Active
67 Microtunnelling: Optimising Low-Emission Construction of Buried Utility Infrastructure (MOLE) EPSRC
£0
Sept. 30, 2021 March 30, 2025 Active
68 LIMES.NET: Network for Low Impact Materials and innovative Engineering Solutions for the built environment EPSRC
£449,858
Aug. 31, 2011 Sept. 29, 2012 Closed
69 LIMES.NET: Network for Low Impact Materials and innovative Engineering Solutions for the built environment EPSRC
£1,124,645
Aug. 31, 2011 Sept. 30, 2012 Closed
70 Low Carbon Concrete Manufacturing Process Innovate UK
£333,204
March 1, 2021 Dec. 31, 2021 Closed
71 Development of versatile liquid metal testing facility for lead-cooled fast reactor technology EPSRC
£1,882,080
Jan. 1, 2020 Dec. 31, 2022 Closed
72 Cement 2 Zero Innovate UK
£30,000
Feb. 1, 2022 March 30, 2022 Closed
73 Structural performance of slab-column connenctions under impact and blast loading EPSRC
£498,210
Feb. 4, 2013 Aug. 4, 2014 Closed
74 Rapid Inspection of Complex Geometries Using Edge-Guided Ultrasonic Waves EPSRC
£292,314
Aug. 31, 2015 Dec. 1, 2017 Closed
75 SOIL STABILISATION USING INTEGRATED DESIGN OF LOW CO2 ALTERNATIVE CEMENTITIOUS BINDERS Innovate UK
£95,700
Feb. 1, 2022 July 30, 2022 Closed
76 Hemp Stalk Structural Frames Innovate UK
£49,998
Nov. 1, 2013 May 30, 2014 Closed
77 Novel Additives to Enhance the Performance of Low Carbon Cements for a Net Zero Future EPSRC
£0
Sept. 25, 2022 March 25, 2026 Active
78 Regenerative 3D printed cementitious skins for building components (Re3DSkin) EPSRC
£246,904
Aug. 31, 2022 Aug. 30, 2024 Active
79 Digital Twins-based integrated corrosion fatigue prognosis of wind turbines Towers in modular energy islands UKRI
£204,031
Aug. 31, 2023 Aug. 30, 2025 Active
80 Digital Twins-based integrated corrosion fatigue prognosis of wind turbines Towers in modular energy islands Horizon Europe Guarantee
£1,020,155
March 1, 2023 Feb. 28, 2025 Active
Reset