Home Projects More like: Cost-benefit analysis and multi-criteria optimisation for low-carbon heating strategy options [Clear] # Title Funder Funding Start End Status 21 GCRF_NF55 Fast-track vaccine cold-chain assessment and design for mass scale COVID-19 vaccination in Bangladesh (VaCoBD) EPSRC £1,059,186 Aug. 13, 2020 April 29, 2022 Closed 22 GCRF_NF55 Fast-track vaccine cold-chain assessment and design for mass scale COVID-19 vaccination in Bangladesh (VaCoBD) GCRF £2,647,965 Aug. 13, 2020 March 31, 2022 Closed 23 Heat as a Service (HaaS) using Warmstone Zero Carbon Boiler (ZCB) Innovate UK £101,404 Nov. 1, 2020 Jan. 31, 2021 Closed 24 Heat as a Service (HaaS) using Warmstone Zero Carbon Boiler (ZCB) Innovate UK £253,510 Nov. 1, 2020 Jan. 31, 2021 Closed 25 Future Vaccine Manufacturing Hub: Advancing the manufacture and deployment of cost effective vaccines EPSRC £21,832,131 Dec. 1, 2017 March 30, 2023 Active 26 Future Vaccine Manufacturing Hub: Advancing the manufacture and deployment of cost effective vaccines EPSRC £62,759,750 Dec. 1, 2017 Sept. 1, 2023 Closed 27 Supergen Bioenergy Hub EPSRC £7,134,768 July 31, 2012 July 30, 2017 Closed 28 Ultra Compact Micro Turbine Range Extender for Battery Electric Vehicles Innovate UK £150,000 Nov. 1, 2011 May 30, 2012 Closed 29 Redeploying second-life EV/HEV batteries for novel renewable energy applications: A Feasibility Study Innovate UK £158,330 Dec. 1, 2011 Dec. 31, 2012 Closed 30 Ultra Compact Micro Turbine Range Extender for Battery Electric Vehicles Innovate UK £375,000 Nov. 1, 2011 May 31, 2012 Closed 31 Redeploying second-life EV/HEV batteries for novel renewable energy applications: A Feasibility Study Innovate UK £395,825 Dec. 1, 2011 Dec. 31, 2012 Closed 32 Capture and Reuse Of biogenic gases for Negative-emission - sustainable biofuels: CRONUS Horizon Europe Guarantee £2,622,800 Dec. 1, 2022 Aug. 31, 2026 Active 33 Optimizing the Approaches to Printed Electronics for Energy Storage EPSRC £0 Sept. 30, 2016 May 25, 2020 Closed 34 Including perennial crops in the Cool Farm Tool NERC £193,062 March 31, 2016 April 29, 2017 Closed 35 Including perennial crops in the Cool Farm Tool NERC £482,655 March 31, 2016 April 30, 2017 Closed 36 Can heat stored within existing mine infrastructure be used to deliver flexibility to an energy system which is becoming more complex as it transition EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 37 Can heat stored within existing mine infrastructure be used to deliver flexibility to an energy system which is becoming more complex as it transition EPSRC £0 Sept. 30, 2019 Sept. 30, 2023 Closed 38 AI6S – AI lean six-sigma process optimisation for energy efficiency and waste reduction in foundation industries ISCF £5,172,584 Aug. 31, 2021 Aug. 31, 2023 Closed 39 Smart logistics network cost optimisation Innovate UK £639,496 March 1, 2021 Aug. 30, 2021 Closed 40 Leveraging the potential of data-driven methodologies to develop prescriptive maintenance strategies for offshore wind farms EPSRC £0 Aug. 31, 2019 Nov. 30, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »