Home Projects More like: Development of very low carbon footprint hydrogen distribution, utilising: 90% lower cost alkaline electrolyser with low cost end-user fuel cell solutions manufacturing [Clear] # Title Funder Funding Start End Status 1 Novel alkaline electrolyser with optimized micro-patterned electrodes for efficient ultra-low cost hydrogen Innovate UK £249,905 May 31, 2023 Nov. 30, 2023 Active 2 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC £162,381 Sept. 30, 2022 March 31, 2024 Active 3 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC £88,585 May 31, 2022 Nov. 30, 2023 Active 4 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC £811,905 Sept. 30, 2022 March 31, 2024 Active 5 Advanced High Pressure and Cost-Effective PEM Water Electrolysis Technology Horizon Europe Guarantee £2,469,075 Feb. 1, 2023 Jan. 31, 2026 Active 6 Low cost storage of renewable energy EPSRC £262,094 Dec. 16, 2015 Dec. 15, 2018 Closed 7 Low cost storage of renewable energy EPSRC £655,235 Dec. 16, 2015 Dec. 15, 2018 Closed 8 LOCATE: LOw Cost cATalysts for water Electrolysers Innovate UK £713,498 Sept. 30, 2014 April 29, 2016 Closed 9 Development of Novel AEM Water Electrolyser Cell for Hydrogen Production for Energy Storage EPSRC £0 Sept. 30, 2021 March 30, 2025 Active 10 Development of Novel AEM Water Electrolyser Cell for Hydrogen Production for Energy Storage EPSRC £0 Sept. 30, 2021 March 31, 2025 Active 11 Green hydrogen for Swindon's public access refuelling and multi vehicle use Innovate UK £3,245,640 Nov. 1, 2012 Jan. 31, 2016 Closed 12 Green hydrogen for Swindon's public access refuelling and multi vehicle use Innovate UK £8,114,100 Nov. 1, 2012 Jan. 31, 2016 Closed 13 HySMART Innovate UK £1,263,736 March 31, 2021 March 30, 2022 Closed 14 DIMENSIONALLY STABLE ELECTRODES FOR SUPERCRITICAL WATER ELECTROLYSIS (SuperH2) EPSRC £252,097 July 24, 2022 Jan. 24, 2024 Active 15 DIMENSIONALLY STABLE ELECTRODES FOR SUPERCRITICAL WATER ELECTROLYSIS (SuperH2) EPSRC £1,260,485 July 24, 2022 Jan. 24, 2024 Active 16 Carbamide Power Systems - Urea Fuel Cells for Low Cost Energy EPSRC £142,066 July 31, 2011 June 29, 2012 Closed 17 Carbamide Power Systems - Urea Fuel Cells for Low Cost Energy EPSRC £261,090 May 6, 2010 Sept. 30, 2010 Closed 18 Carbamide Power Systems - Urea Fuel Cells for Low Cost Energy EPSRC £355,165 July 31, 2011 June 30, 2012 Closed 19 Carbamide Power Systems - Urea Fuel Cells for Low Cost Energy EPSRC £652,725 May 6, 2010 Oct. 1, 2010 Closed 20 AHEAD (Affordable Hydrogen from Electrolysis Accelerating Decarbonisation) Innovate UK £644,788 May 31, 2021 Nov. 30, 2022 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »