Home Projects More like: Econoblok certification [Clear] # Title Funder Funding Start End Status 81 CarbonCounter Innovate UK £814,940 March 1, 2010 Aug. 30, 2013 Closed 82 Advanced Radioactive Waste Treatment using Nanostructured Hybrid Composites (NaSHC). EPSRC £919,040 April 19, 2015 April 19, 2018 Closed 83 Intelligent Additive Construction using Geomaterials EPSRC £0 Sept. 23, 2018 Jan. 24, 2023 Active 84 Multimetallic CO2 Reduction Catalysts as Artificial Cofactors EPSRC £661,284 Dec. 1, 2023 Nov. 30, 2025 Active 85 CarbonVue - integrated carbon and productivity end-to-end supply chain management Innovate UK £2,808,153 March 1, 2021 March 30, 2023 Active 86 Implementing Whole Life Carbon in Buildings EPSRC £158,600 Dec. 1, 2015 March 30, 2017 Closed 87 SHUTTERING: Low carbon concrete Structures witH aUxeTic TextilE foRmworks as reinforcING element EPSRC £2,958,922 May 31, 2022 Aug. 30, 2025 Active 88 Innovative Intermodal Container Innovate UK £198,480 Nov. 1, 2021 March 30, 2022 Closed 89 A Pioneering, Near-Zero-Carbon and All-Climate-Adaptive Air Conditioning System Using Atmospheric Latent Heat and Natural Light Energy EPSRC £4,071,610 Aug. 31, 2023 Feb. 28, 2027 Active 90 SPECIFIC Tranche 1: Buildings as Power Stations EPSRC £13,959,335 June 30, 2012 June 30, 2016 Closed 91 SPECIFIC Tranche 1: Buildings as Power Stations EPSRC £5,583,734 June 30, 2012 June 29, 2016 Closed 92 Reducing Construction Carbon Emissions in Logistics (ReCCEL) Innovate UK £197,884 Sept. 30, 2015 Sept. 29, 2016 Closed 93 Celsa Cardiff Steelworks Static VAR Compensator Innovate UK £5,999,998 May 31, 2021 May 30, 2023 Active 94 Celsa Cardiff Steelworks Static VAR Compensator Innovate UK £14,999,995 May 31, 2021 Feb. 29, 2024 Active 95 Increasing the early age strength of High Volume Fly Ash (HVFA) concrete EPSRC £195,514 Sept. 9, 2012 March 9, 2015 Closed 96 Graphene Enhanced Concrete for a Resilient Recovery Innovate UK £757,242 March 31, 2021 March 30, 2022 Closed 97 Multi-terminal dc transmission micro-grid system for interfacing multiple wind turbines EPSRC £1,043,994 Aug. 31, 2008 Feb. 29, 2012 Closed 98 Multi-terminal dc transmission micro-grid system for interfacing multiple wind turbines EPSRC £2,609,985 Aug. 31, 2008 Feb. 29, 2012 Closed 99 Engineered UK clays for production of low-carbon cements EPSRC £165,356 June 30, 2022 June 29, 2026 Active 100 Engineered UK clays for production of low-carbon cements EPSRC £997,934 June 30, 2022 June 29, 2026 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »