# Title Funder Funding Start End Status
1 Can heat stored within existing mine infrastructure be used to deliver flexibility to an energy system which is becoming more complex as it transition EPSRC
£0
Sept. 30, 2019 Sept. 30, 2023 Closed
2 GigaWatt-Hour Subsurface Thermal Energy storAge: Engineered structures and legacy Mine shafts: STEaM EPSRC
£978,269
Aug. 12, 2022 Aug. 11, 2024 Active
3 GigaWatt-Hour Subsurface Thermal Energy storAge: Engineered structures and legacy Mine shafts: STEaM EPSRC
£215,571
June 30, 2022 June 29, 2024 Active
4 GigaWatt-Hour Subsurface Thermal Energy storAge: Engineered structures and legacy Mine shafts: STEaM EPSRC
£4,891,345
Aug. 12, 2022 Feb. 12, 2025 Active
5 Optimisation of thermal energy storage in abandoned flooded mine workings EPSRC
£0
Sept. 30, 2018 May 29, 2022 Active
6 Optimisation of thermal energy storage in abandoned flooded mine workings EPSRC
£0
Sept. 30, 2018 May 30, 2022 Closed
7 Geothermal Energy from Mines and Solar-Geothermal heat (GEMS) EPSRC
£2,843,520
Aug. 31, 2021 Aug. 30, 2024 Active
8 Geothermal Energy from Mines and Solar-Geothermal heat (GEMS) EPSRC
£7,108,800
Aug. 31, 2021 Aug. 31, 2024 Active
9 Mapping of subsurface minewater resources against surface demands EPSRC
£0
March 1, 2022 Aug. 30, 2025 Active
10 Mapping of subsurface minewater resources against surface demands EPSRC
£0
March 1, 2022 Aug. 31, 2025 Active
11 Network headroom, engineering upgrades and public acceptance (NEUPA): Connecting engineering for heat system change to consumers and citizens EPSRC
£2,464,018
June 30, 2020 Jan. 31, 2024 Active
12 Network headroom, engineering upgrades and public acceptance (NEUPA): Connecting engineering for heat system change to consumers and citizens EPSRC
£6,160,045
June 30, 2020 Jan. 31, 2024 Active
13 MaxImiSing flexibility through multi-Scale IntegratiON of energy systems (MISSION) EPSRC
£1,257,744
June 28, 2018 May 30, 2022 Closed
14 PLATFORM: Decentralised polygeneration of energy: Cross-disciplinary research at Imperial College London EPSRC
£0
Nov. 20, 2007 Aug. 19, 2010 Closed
15 Zero-Carbon Emission Integrated Cooling, Heating and Power (ICHP) Networks EPSRC
£2,303,080
June 30, 2021 June 29, 2024 Active
16 Zero-Carbon Emission Integrated Cooling, Heating and Power (ICHP) Networks EPSRC
£5,757,700
June 30, 2021 March 31, 2025 Active
17 Reducing Environmentally Problematic Landfill And Circular Economy approaches for Waste Minerals (REPLACE for Waste Minerals EPSRC
£0
Sept. 30, 2021 Sept. 29, 2025 Active
18 Reducing Environmentally Problematic Landfill And Circular Economy approaches for Waste Minerals (REPLACE for Waste Minerals EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
19 Intelligent Bridgend Energy System Designs Innovate UK
£234,376
Jan. 1, 2019 June 29, 2019 Closed
20 Intelligent Bridgend Energy System Designs ISCF
£585,940
Jan. 1, 2019 June 30, 2019 Closed
Reset