Home Projects More like: Wood fibre insulation from sawmill residue to produce insulated fabricated timber components for closed-loop, resource efficient building [Clear] # Title Funder Funding Start End Status 1 Fire Science In High-Rise Timber Buildings EPSRC £0 Sept. 29, 2019 May 11, 2023 Active 2 Flexural Testing of Wood Replacement Product Innovate UK £10,000 Feb. 1, 2013 July 30, 2013 Closed 3 Flexural Testing of Wood Replacement Product AHRC, Innovate UK £25,000 Feb. 1, 2013 July 31, 2013 Closed 4 Bio-fabrication of sustainable functional bacterial cellulose aerogel for building insulation EPSRC £1,249,070 June 11, 2023 June 11, 2025 Active 5 Plummerswood Innovate UK £71,932 Jan. 1, 2012 Dec. 31, 2013 Closed 6 Plummerswood Innovate UK £179,830 Jan. 1, 2012 Dec. 31, 2013 Closed 7 Resolving uncertainty in the thermal performance of natural fibre insulation materials. EPSRC £201,240 Nov. 1, 2012 April 29, 2014 Closed 8 Resolving uncertainty in the thermal performance of natural fibre insulation materials. EPSRC £503,100 Nov. 1, 2012 April 30, 2014 Closed 9 Safety And Fire Reaction Of Structural Power Storage Devices EPSRC £22,415 Jan. 19, 2020 March 25, 2022 Active 10 Safety And Fire Reaction Of Structural Power Storage Devices EPSRC £112,075 Jan. 19, 2020 March 25, 2022 Closed 11 Bio SIP Building System Innovate UK £249,510 May 31, 2023 March 31, 2024 Active 12 Novel co-blended polymer matrix systems for fire resistant structural marine composites EPSRC £854,158 July 18, 2010 July 17, 2014 Closed 13 Novel co-blended polymer matrix systems for fire resistant structural marine composites EPSRC £696,672 Nov. 1, 2010 Oct. 31, 2014 Closed 14 Novel co-blended polymer matrix systems for fire resistant structural marine composites EPSRC £2,135,395 July 18, 2010 July 18, 2014 Closed 15 Energy efficient bio-based natural fibre insulation Innovate UK £1,953,395 Aug. 31, 2008 Feb. 29, 2012 Closed 16 HempSil Board - a low carbon breathable insulating plasterboard Innovate UK £271,665 July 31, 2023 Jan. 31, 2024 Active 17 G8-2012 Structural Bamboo Products EPSRC £845,504 Feb. 1, 2013 Jan. 31, 2016 Closed 18 Reduced in-use building energy consumption from improved building temperature stability using dual-function ceramic aqueous paints Innovate UK £514,680 March 1, 2009 Feb. 29, 2012 Closed 19 LIMES.NET: Network for Low Impact Materials and innovative Engineering Solutions for the built environment EPSRC £449,858 Aug. 31, 2011 Sept. 29, 2012 Closed 20 LIMES.NET: Network for Low Impact Materials and innovative Engineering Solutions for the built environment EPSRC £1,124,645 Aug. 31, 2011 Sept. 30, 2012 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »