# Title Funder Funding Start End Status
21 LIMES.NET: Network for Low Impact Materials and innovative Engineering Solutions for the built environment EPSRC
£449,858
Aug. 31, 2011 Sept. 29, 2012 Closed
22 LIMES.NET: Network for Low Impact Materials and innovative Engineering Solutions for the built environment EPSRC
£1,124,645
Aug. 31, 2011 Sept. 30, 2012 Closed
23 Energy Harvesting Triboelectric Nano-Generators for the Internet-of-Things EPSRC
£1,265,252
Aug. 31, 2019 Aug. 30, 2023 Active
24 Energy Harvesting Triboelectric Nano-Generators for the Internet-of-Things EPSRC
£3,163,130
Aug. 31, 2019 Aug. 31, 2024 Active
25 Resolving uncertainty in the thermal performance of natural fibre insulation materials. EPSRC
£201,240
Nov. 1, 2012 April 29, 2014 Closed
26 Resolving uncertainty in the thermal performance of natural fibre insulation materials. EPSRC
£503,100
Nov. 1, 2012 April 30, 2014 Closed
27 High-Rise Buildings: Energy and Density EPSRC
£911,750
Nov. 1, 2015 March 31, 2017 Closed
28 SYNAPS (Synchronous Analysis and Protection System) EPSRC
£398,590
Nov. 1, 2015 Jan. 31, 2018 Closed
29 SYNAPS (Synchronous Analysis and Protection System) EPSRC
£996,475
Nov. 1, 2015 Jan. 31, 2018 Closed
30 The Active Building Centre EPSRC
£71,894,854
Sept. 2, 2018 May 6, 2020 Closed
31 The Active Building Centre ISCF
£179,737,135
Sept. 2, 2018 May 7, 2020 Closed
32 Multi-objective performance-based design of tall buildings using energy harvesting enabled tuned mass-damper-inerter (TMDI) devices EPSRC
£1,253,690
Jan. 1, 2015 Sept. 30, 2017 Closed
33 Buoyancy-Induced Flow and Heat Transfer inside Compressor Rotors EPSRC
£1,436,530
Jan. 11, 2017 Dec. 31, 2020 Closed
34 FITS-LCD: Fabric Integrated Thermal Storage for Low-Carbon Dwellings EPSRC
£1,997,756
March 31, 2016 March 31, 2019 Closed
35 FITS-LCD: Fabric Integrated Thermal Storage for Low-Carbon Dwellings EPSRC
£4,994,390
March 31, 2016 March 31, 2019 Closed
36 Minimising energy in construction EPSRC
£401,876
May 31, 2017 Sept. 13, 2017 Closed
37 Minimising energy in construction EPSRC
£364,180
Sept. 14, 2017 Oct. 31, 2019 Closed
38 Minimising energy in construction EPSRC
£1,004,690
May 31, 2017 Sept. 14, 2017 Closed
39 Minimising energy in construction EPSRC
£910,450
Sept. 14, 2017 Oct. 31, 2019 Closed
40 Design and Maintenance of Nuclear Safety Systems for Life Extension (DaMSSLE) EPSRC
£2,789,650
Dec. 1, 2015 Nov. 30, 2019 Closed
Reset