# Title Funder Funding Start End Status
61 Atomic-Scale Characterisation of Reactor Pressure Steels EPSRC
£0
Sept. 30, 2018 March 30, 2022 Active
62 Atomic-Scale Characterisation of Reactor Pressure Steels EPSRC, NERC
£0
Sept. 30, 2018 July 31, 2022 Closed
63 Atomic-Scale Characterisation of Reactor Pressure Steels EPSRC
£0
Sept. 30, 2018 March 31, 2022 Closed
64 Fracture of Ferroelectric / Ferroelastic Ceramics EPSRC
£186,226
Jan. 1, 2007 Dec. 31, 2009 Closed
65 Nuclear Physics Rolling Grant STFC
£6,961,825
July 31, 2008 Aug. 1, 2011 Closed
66 Investigation into the fundamentals of contact mechanics in turbine blades roots to enable improved techniques for design optimisation and reliability EPSRC
£0
Sept. 30, 2019 Sept. 29, 2022 Active
67 Environmentally induced damage propagation with localised stresses in CMCs EPSRC
£0
Sept. 30, 2018 Sept. 29, 2022 Active
68 Mechanical properties of solid state batteries EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
69 The effect of corrosive environment on the crack growth behaviour of nickel based superalloys EPSRC
£0
Sept. 30, 2021 Sept. 29, 2025 Active
70 Damage Detection and Diagnostic Platform for Wind Turbines Innovate UK
£43,724
Nov. 1, 2022 March 30, 2023 Active
71 Nonlinear Frequency Analysis of Lithium-ion Batteries EPSRC
£0
Sept. 30, 2020 Sept. 29, 2024 Active
72 Fatigue and damage tolerance of 3D-woven composites EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
73 Linking Microstructure to Neutron Irradiation Defects in Advanced Manufacture of Steels EPSRC
£0
Sept. 30, 2017 Sept. 29, 2021 Closed
74 On the Behaviour of Discontinuous Interfaces under Dynamic Loading EPSRC
£0
Sept. 30, 2021 Sept. 29, 2025 Active
75 Geomechanical Assessment of CO2 Storage Reservoir Integrity Post-closure (GASRIP) NERC
£330,242
Nov. 1, 2019 June 29, 2021 Closed
76 Geomechanical Assessment of CO2 Storage Reservoir Integrity Post-closure (GASRIP) NERC
£655,948
Jan. 2, 2018 Oct. 31, 2019 Closed
77 Geomechanical Assessment of CO2 Storage Reservoir Integrity Post-closure (GASRIP) NERC
£825,605
Nov. 1, 2019 June 30, 2021 Closed
78 Advanced chemistry and corrosion studies under hot water conditions relevant to LWR coolant EPSRC, NERC
£0
Sept. 30, 2018 June 30, 2022 Closed
79 Decoupled Electrolysis for the Production of Zero-Carbon Hydrogen EPSRC
£217,826
Nov. 1, 2022 April 29, 2024 Active
80 Decoupled Electrolysis for the Production of Zero-Carbon Hydrogen EPSRC
£1,089,130
Nov. 1, 2022 April 30, 2024 Active
Reset