Home Projects More like: Hydrogen Transport and Trapping Mechanisms Controlling Embrittlement of Nickel Alloys in Low Carbon Energy Systems [Clear] # Title Funder Funding Start End Status 61 Atomic-Scale Characterisation of Reactor Pressure Steels EPSRC £0 Sept. 30, 2018 March 30, 2022 Active 62 Atomic-Scale Characterisation of Reactor Pressure Steels EPSRC, NERC £0 Sept. 30, 2018 July 31, 2022 Closed 63 Atomic-Scale Characterisation of Reactor Pressure Steels EPSRC £0 Sept. 30, 2018 March 31, 2022 Closed 64 Fracture of Ferroelectric / Ferroelastic Ceramics EPSRC £186,226 Jan. 1, 2007 Dec. 31, 2009 Closed 65 Nuclear Physics Rolling Grant STFC £6,961,825 July 31, 2008 Aug. 1, 2011 Closed 66 Investigation into the fundamentals of contact mechanics in turbine blades roots to enable improved techniques for design optimisation and reliability EPSRC £0 Sept. 30, 2019 Sept. 29, 2022 Active 67 Environmentally induced damage propagation with localised stresses in CMCs EPSRC £0 Sept. 30, 2018 Sept. 29, 2022 Active 68 Mechanical properties of solid state batteries EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 69 The effect of corrosive environment on the crack growth behaviour of nickel based superalloys EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 70 Damage Detection and Diagnostic Platform for Wind Turbines Innovate UK £43,724 Nov. 1, 2022 March 30, 2023 Active 71 Nonlinear Frequency Analysis of Lithium-ion Batteries EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 72 Fatigue and damage tolerance of 3D-woven composites EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 73 Linking Microstructure to Neutron Irradiation Defects in Advanced Manufacture of Steels EPSRC £0 Sept. 30, 2017 Sept. 29, 2021 Closed 74 On the Behaviour of Discontinuous Interfaces under Dynamic Loading EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 75 Geomechanical Assessment of CO2 Storage Reservoir Integrity Post-closure (GASRIP) NERC £330,242 Nov. 1, 2019 June 29, 2021 Closed 76 Geomechanical Assessment of CO2 Storage Reservoir Integrity Post-closure (GASRIP) NERC £655,948 Jan. 2, 2018 Oct. 31, 2019 Closed 77 Geomechanical Assessment of CO2 Storage Reservoir Integrity Post-closure (GASRIP) NERC £825,605 Nov. 1, 2019 June 30, 2021 Closed 78 Advanced chemistry and corrosion studies under hot water conditions relevant to LWR coolant EPSRC, NERC £0 Sept. 30, 2018 June 30, 2022 Closed 79 Decoupled Electrolysis for the Production of Zero-Carbon Hydrogen EPSRC £217,826 Nov. 1, 2022 April 29, 2024 Active 80 Decoupled Electrolysis for the Production of Zero-Carbon Hydrogen EPSRC £1,089,130 Nov. 1, 2022 April 30, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »