Home Projects More like: Hydrogen Enrichment of Natural Gas by Methane Cracking [Clear] # Title Funder Funding Start End Status 81 The Supergen5 Biological Fuel Cells Consortium EPSRC £10,123,585 April 17, 2006 Oct. 17, 2010 Closed 82 Assessing the Potential of Synthetic Fuels for Low Carbon Transport in UK and Globally EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 83 The reduction of carbon dioxide by enzymes adsorbed on electrodes: from mechanistic studies to bioinspired catalysts BBSRC £479,166 Oct. 21, 2012 Oct. 20, 2015 Closed 84 The Reduction of Carbon Dioxide by Enzymes Adsorbed on Electrodes: from Mechanistic Studies to Bioinspired Catalysts BBSRC £620,246 Nov. 26, 2012 March 30, 2016 Closed 85 New Approaches for Methane Emission Control EPSRC £0 Aug. 31, 2018 Feb. 28, 2022 Closed 86 Enhanced onshore oil recovery through novel combine heat and power stirling technology Innovate UK £383,926 March 1, 2016 Nov. 30, 2018 Closed 87 Enhanced onshore oil recovery through novel combine heat and power stirling technology Innovate UK £959,815 March 1, 2016 Nov. 30, 2018 Closed 88 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC £162,381 Sept. 30, 2022 March 31, 2024 Active 89 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC £88,585 May 31, 2022 Nov. 30, 2023 Active 90 BLOG-H (using a Battolyser to produce LOw cost Green Hydrogen) EPSRC £811,905 Sept. 30, 2022 March 31, 2024 Active 91 Hydrothermal Upgrading of Biomass/Lignin EPSRC £0 Nov. 1, 2018 July 30, 2022 Active 92 Hydrothermal Upgrading of Biomass/Lignin EPSRC £0 Nov. 1, 2018 July 31, 2022 Closed 93 A Coordinated, Comprehensive approach to Carbon Capture and Utilisation EPSRC £9,119,946 Sept. 6, 2012 Sept. 5, 2017 Closed 94 Single Photon Lidar Imaging of Carbon Emissions (SPLICE) Innovate UK £4,885,910 May 31, 2020 Nov. 30, 2022 Active 95 Demonstration Of A Comprehensive Approach To Monitoring Emissions From Oil and Gas Installations (AEOG) NERC £810,426 Jan. 1, 2018 Aug. 30, 2021 Closed 96 Unsteady Fluid Dynamics of Tidal Stream Turbines EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 97 Unsteady Fluid Dynamics of Tidal Stream Turbines EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 98 Bacterial hydrogenases for biohydrogen technology BBSRC £730,114 Dec. 1, 2009 Nov. 30, 2012 Closed 99 Bacterial hydrogenases for biohydrogen technology BBSRC £1,048,408 Sept. 30, 2009 March 31, 2013 Closed 100 Nano-Integration of Metal-Organic Frameworks and Catalysis for the Uptake and Utilisation of CO2 EPSRC £2,374,854 April 30, 2010 Feb. 14, 2014 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »