Home Projects More like: Engineering FUngal Networks for Ground Improvement (Engineering FUNGI) [Clear] # Title Funder Funding Start End Status 41 Network headroom, engineering upgrades and public acceptance (NEUPA): Connecting engineering for heat system change to consumers and citizens EPSRC £2,464,018 June 30, 2020 Jan. 31, 2024 Active 42 Network headroom, engineering upgrades and public acceptance (NEUPA): Connecting engineering for heat system change to consumers and citizens EPSRC £6,160,045 June 30, 2020 Jan. 31, 2024 Active 43 Cleaning Land for Wealth EPSRC £4,977,908 March 1, 2013 July 31, 2016 Closed 44 EPSRC Centre for Doctoral Training in Renewable Energy Marine Structures (REMS) EPSRC £12,047,608 April 30, 2014 Dec. 31, 2022 Active 45 EPSRC Centre for Doctoral Training in Renewable Energy Marine Structures (REMS) EPSRC £20,130,010 April 30, 2014 Dec. 31, 2022 Closed 46 Concrete modelled using random elements EPSRC £1,212,072 Sept. 14, 2017 Oct. 4, 2021 Closed 47 Concrete modelled using random elements EPSRC £1,915,578 July 5, 2015 Sept. 13, 2017 Closed 48 Imaging Membrane Potential via Second Harmonic Generation EPSRC £1,578,386 Aug. 31, 2010 Aug. 30, 2014 Closed 49 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 50 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 51 21ENGBIO Engineering biomineralized carbon-sulfur composites for clean energy technologies BBSRC £166,472 Jan. 31, 2022 Jan. 30, 2023 Active 52 21ENGBIO Engineering biomineralized carbon-sulfur composites for clean energy technologies BBSRC £416,180 Jan. 31, 2022 July 31, 2023 Closed 53 Non Steady Analytical Models for Energy Pile Testing and Design EPSRC £199,538 Dec. 1, 2016 Sept. 13, 2019 Closed 54 Non Steady Analytical Models for Energy Pile Testing and Design EPSRC £498,845 Dec. 1, 2016 Sept. 14, 2019 Closed 55 FLITES : Fibre-Laser Imaging of gas Turbine Exhaust Species EPSRC £1,225,156 June 30, 2013 Feb. 28, 2017 Closed 56 FLITES : Fibre-Laser Imaging of gas Turbine Exhaust Species EPSRC £1,411,950 April 30, 2012 Feb. 28, 2013 Closed 57 FLITES : Fibre-Laser Imaging of gas Turbine Exhaust Species EPSRC £3,529,875 April 30, 2012 Feb. 28, 2013 Closed 58 FLITES : Fibre-Laser Imaging of gas Turbine Exhaust Species EPSRC £3,062,890 June 30, 2013 Feb. 28, 2017 Closed 59 Biosynthesis, Regulation and Engineering of Bacterial Carbon Fixation Machinery BBSRC £945,024 Sept. 30, 2015 Jan. 31, 2019 Closed 60 Biosynthesis, Regulation and Engineering of Bacterial Carbon Fixation Machinery BBSRC £2,362,560 Sept. 30, 2015 Jan. 31, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »