Home Projects More like: Uncovering Fundamental Mechanisms to Enable Sustainable Steel Manufacturing [Clear] # Title Funder Funding Start End Status 1 Fate of the Residual Elementsfrom Coal Injection during Iron Making Processes EPSRC £0 June 30, 2019 June 29, 2023 Active 2 Greenhouse Gas Removal in the Iron and Steel Industry NERC £1,218,345 July 31, 2017 Dec. 31, 2018 Closed 3 Greenhouse Gas Removal in the Iron and Steel Industry NERC £1,529,580 Jan. 25, 2019 June 30, 2022 Closed 4 Critical Technological Assessment of the Viability of Future UK Steel Production EPSRC £817,406 Jan. 1, 2019 Dec. 31, 2020 Closed 5 Reduction of iron oxide by carbon and gas in a novel low carbon, low energy alternative ironmaking process EPSRC £0 Sept. 29, 2019 Sept. 29, 2023 Active 6 Cement 2 Zero Innovate UK £30,000 Feb. 1, 2022 March 30, 2022 Closed 7 SUSTAIN Manufacturing Hub EPSRC £21,321,975 March 31, 2019 March 30, 2026 Active 8 SUSTAIN Manufacturing Hub EPSRC £54,264,940 March 31, 2019 Sept. 30, 2026 Active 9 Boosting Reduction of Energy Intensity in cleaN STeelwork platfORM EPSRC £1,715,006 June 30, 2019 June 29, 2023 Active 10 Boosting Reduction of Energy Intensity in cleaN STeelwork platfORM EPSRC £4,287,515 June 30, 2019 June 30, 2024 Active 11 Development of strong, formable, stainless and low-cost magnesium alloys for next generation cars UKRI £2,376,522 Aug. 31, 2020 Aug. 30, 2024 Active 12 Reducing uncertainty in predicting the risk of geological storage of CO2 - Improved geomechanical models and calibration using seismic data EPSRC £2,026,294 Sept. 30, 2013 Sept. 29, 2018 Closed 13 Reducing uncertainty in predicting the risk of geological storage of CO2 - Improved geomechanical models and calibration using seismic data EPSRC £5,065,735 Sept. 30, 2013 Sept. 30, 2018 Closed 14 Sustainable Product Engineering Centre for Innovative Functional Industrial Coatings - SPECIFIC EPSRC £10,024,210 March 31, 2011 July 30, 2016 Closed 15 Sustainable Product Engineering Centre for Innovative Functional Industrial Coatings - SPECIFIC EPSRC £25,060,525 March 31, 2011 July 31, 2016 Closed 16 ASSURE - Advanced Steel Shaping Using Reduced Energy EPSRC £383,726 Jan. 1, 2015 Oct. 31, 2016 Closed 17 ASSURE - Advanced Steel Shaping Using Reduced Energy EPSRC £959,315 Jan. 1, 2015 Oct. 31, 2016 Closed 18 The development of effective grain refiner for the production of high performance light metal castings EPSRC £242,288 July 31, 2012 Oct. 31, 2013 Closed 19 The development of effective grain refiner for the production of high performance light metal castings EPSRC £605,720 July 31, 2012 Oct. 31, 2013 Closed 20 R3AW: Resource Recovery and Remediation for Alkaline Wastes NERC £229,587 April 7, 2013 Oct. 6, 2013 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »