# Title Funder Funding Start End Status
1 REFINE: a coordinated materials programme for the sustainable REduction of spent Fuel vital In a closed loop Nuclear Energy cycle EPSRC
£430,798
Sept. 30, 2011 March 30, 2016 Closed
2 REFINE: A coordinated materials programme for the sustainable REduction of spent Fuel vital In a closed loop Nuclear Energy cycle EPSRC
£553,742
March 23, 2012 March 22, 2016 Closed
3 REFINE: A coordinated materials programme for the sustainable REduction of spent Fuel vital In a closed loop Nuclear Energy cycle EPSRC
£891,040
Dec. 1, 2011 March 30, 2016 Closed
4 REFINE: a coordinated materials programme for the sustainable REduction of spent Fuel vital In a closed loop Nuclear Energy cycle EPSRC
£681,348
Feb. 6, 2012 March 30, 2016 Closed
5 REFINE: A coordinated materials programme for the sustainable REduction of spent Fuel vital In a closed loop Nuclear Energy cycle EPSRC
£5,497,570
Sept. 30, 2011 March 31, 2016 Closed
6 High Temperature Zirconium Alloys for Nuclear Fusion and Generation IV Fission Reactors EPSRC
£1,508,740
Aug. 31, 2020 Feb. 28, 2023 Closed
7 Tritium removal from molten salt media in nuclear fusion and fission processes EPSRC
£0
Sept. 30, 2022 Sept. 29, 2026 Active
8 Intermetallic Dispersion Strengthened 'IDS-Steels' for Generation IV Nuclear EPSRC
£628,950
June 30, 2022 June 29, 2025 Active
9 Intermetallic Dispersion Strengthened 'IDS-Steels' for Generation IV Nuclear EPSRC
£3,144,750
June 30, 2022 June 30, 2025 Active
10 A molten salt community framework for predictive modelling of critical characteristics EPSRC
£2,955,910
June 30, 2023 June 30, 2026 Active
11 INNUMAT: Innovative Structural Materials for Fission and Fusion Horizon Europe Guarantee
£796,710
Aug. 31, 2022 Aug. 31, 2026 Active
12 Salt-cooled High-temperature Reactors EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
13 Feasibility of the use of frozen walls in molten salt fast reactors (MSFR-FW) EPSRC
£403,472
July 2, 2017 July 1, 2018 Closed
14 Feasibility of the use of frozen walls in molten salt fast reactors (MSFR-FW) EPSRC
£1,008,680
July 2, 2017 July 2, 2018 Closed
15 Ni-based ODS alloys for Molten Salt Reactors EPSRC
£2,498,640
Dec. 1, 2019 Nov. 30, 2023 Active
16 Deposition-MSFR: a numerical study for the surface plating of noble metals in Molten Salt Fast Reactors STFC
£91,610
Jan. 1, 2022 Aug. 30, 2022 Closed
17 A Diamond Detector for Monitoring Of Neutron Irradiation and Criticality STFC
£1,827,000
April 29, 2020 Jan. 29, 2024 Active
18 Radiochemical Facilities for the Molten Salts in Nuclear Technologies Network EPSRC
£11,662,850
Nov. 1, 2019 April 30, 2023 Closed
19 DAWNMANTLE - Decontamination and waste minimisation strategies for and using advanced molten salt nuclear technologies EPSRC
£1,905,200
Aug. 31, 2019 Feb. 28, 2023 Closed
20 Mechanisms of Retention and Transport of Fission Products in Virgin and Irradiated Nuclear Graphite EPSRC
£1,599,610
March 1, 2018 Sept. 30, 2021 Closed
Reset