Home Projects More like: System Architecture Challenges: Supergen+ for HubNet [Clear] # Title Funder Funding Start End Status 61 Co-benefits of energy networks integration technologies for system operation EPSRC, NERC £0 Sept. 30, 2018 March 31, 2023 Closed 62 Border Patrol: Improving Smart Device Security through Type-Aware Systems Design EPSRC £8,828,795 Feb. 1, 2017 July 31, 2023 Closed 63 Inverter connected battery technology with advanced fault ride through capability on LV grid system to help offset the need for standby generation EPSRC £196,306 Oct. 4, 2010 Jan. 4, 2013 Closed 64 Inverter connected battery technology with advanced fault ride through capability on LV grid system to help offset the need for standby generation EPSRC £490,765 Oct. 4, 2010 Jan. 4, 2013 Closed 65 Converged Approach towards Resilient Industrial control systems and Cyber Assurance (CAPRICA) EPSRC £788,612 Feb. 1, 2015 Dec. 31, 2017 Closed 66 Converged Approach towards Resilient Industrial control systems and Cyber Assurance (CAPRICA) EPSRC £1,971,530 Feb. 1, 2015 Dec. 31, 2017 Closed 67 Resilient Electricity Networks for Great Britain (RESNET) EPSRC £1,955,678 Aug. 31, 2011 March 30, 2016 Closed 68 Resilient Electricity Networks for Great Britain (RESNET) EPSRC £4,889,195 Aug. 31, 2011 March 31, 2016 Closed 69 Developing Scalable Smart Grid Infrastructure to Enable Secure Transmission System Control EPSRC £1,341,844 March 1, 2013 Feb. 29, 2016 Closed 70 Developing Scalable Smart Grid Infrastructure to Enable Secure Transmission System Control EPSRC £3,354,610 March 1, 2013 Feb. 29, 2016 Closed 71 Sustainable urban power supply through intelligent control and enhanced restoration of AC/DC networks EPSRC £1,209,122 March 31, 2020 March 30, 2023 Active 72 Sustainable urban power supply through intelligent control and enhanced restoration of AC/DC networks EPSRC £3,022,805 March 31, 2020 March 31, 2024 Active 73 Stability and Control of Power Networks with Energy Storage (STABLE-NET) EPSRC £2,096,160 Sept. 29, 2014 March 28, 2018 Closed 74 Stability and Control of Power Networks with Energy Storage (STABLE-NET) EPSRC £5,240,400 Sept. 29, 2014 March 29, 2018 Closed 75 Nash equilibria for load balancing in networked power systems EPSRC £994,762 March 31, 2016 May 10, 2019 Closed 76 Nash equilibria for load balancing in networked power systems EPSRC £2,486,905 March 31, 2016 May 11, 2019 Closed 77 Transforming electricity access through smart sensors and grid efficiency algorithms EPSRC £220,984 Feb. 1, 2018 July 30, 2019 Closed 78 Transforming electricity access through smart sensors and grid efficiency algorithms EPSRC £552,460 Feb. 1, 2018 July 31, 2019 Closed 79 A Networked Market Platform for Electric Vehicle Smart Charging EPSRC £635,484 June 28, 2018 July 14, 2020 Closed 80 A Networked Market Platform for Electric Vehicle Smart Charging EPSRC £247,018 July 15, 2020 June 28, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »