Home Projects More like: Designing the materials for production of tailored and sustainable aviation fuels from waste CO2 and water [Clear] # Title Funder Funding Start End Status 1 Designing the materials for production of tailored and sustainable aviation fuels from waste CO2 and water EPSRC £0 Sept. 30, 2019 Dec. 31, 2023 Active 2 Atomic-scale design of electrocatalysts for renewable energy conversion and storage in energy-rich EPSRC £0 Oct. 6, 2020 March 7, 2024 Active 3 Atomic-scale design of electrocatalysts for renewable energy conversion and storage in energy-rich EPSRC £0 Oct. 4, 2020 March 7, 2024 Active 4 Photoelectrocatalytic CO2 reduction to chemicals and fuels EPSRC £0 Sept. 30, 2019 Oct. 30, 2023 Active 5 Low carbon jet fuel through integration of novel technologies for co-valorisation of CO2 and biomass EPSRC £3,601,034 Jan. 1, 2016 April 29, 2021 Closed 6 Low carbon jet fuel through integration of novel technologies for co-valorisation of CO2 and biomass EPSRC £9,002,585 Jan. 1, 2016 April 30, 2021 Closed 7 High-Throughput Fabrication and Characterisation for Discovery of Novel Energy Materials EPSRC £1,012,685 Feb. 1, 2021 Jan. 31, 2023 Closed 8 High-Throughput Fabrication and Characterisation for Discovery of Novel Energy Materials EPSRC £404,382 Feb. 1, 2021 Jan. 31, 2023 Active 9 EPSRC-SFI:Tailored Production and Utilisation of Sustainable Low Cost Lignocellulosic Advanced Biofuel Blends as Diesel and Petrol Substitutes:SusLABB EPSRC £2,194,792 Jan. 1, 2021 Dec. 31, 2024 Active 10 EPSRC-SFI:Tailored Production and Utilisation of Sustainable Low Cost Lignocellulosic Advanced Biofuel Blends as Diesel and Petrol Substitutes:SusLABB EPSRC £5,486,980 Jan. 1, 2021 Dec. 31, 2024 Active 11 Up-scaling solar hydrogen production EPSRC £1,263,350 Jan. 1, 2023 Nov. 3, 2024 Active 12 Up-scaling solar hydrogen production EPSRC £252,670 March 31, 2022 Sept. 29, 2023 Active 13 NewJet Network+ EPSRC £2,053,264 Dec. 1, 2019 May 30, 2023 Active 14 Development of a sewage sludge waste containing microplastics pyrolysis plant for sustainable hydrogen, syngas and high quality pyrolytic char production Innovate UK £1,343,600 Sept. 30, 2022 March 31, 2024 Active 15 Development of a sewage sludge waste containing microplastics pyrolysis plant for sustainable hydrogen, syngas and high quality pyrolytic char production Innovate UK £268,720 Sept. 30, 2022 March 31, 2024 Active 16 17-ERACoBioTech: Sustainable production of added value chemicals from SynGas-derived methanol through Systems and Synthetic Biology approaches BBSRC £853,042 April 30, 2018 Dec. 31, 2021 Closed 17 Liquid Fuel and bioEnergy Supply from CO2 Reduction EPSRC £3,848,592 March 1, 2016 June 29, 2020 Closed 18 Liquid Fuel and bioEnergy Supply from CO2 Reduction EPSRC £226,712 June 30, 2020 Dec. 31, 2020 Closed 19 Liquid Fuel and bioEnergy Supply from CO2 Reduction EPSRC £566,780 June 30, 2020 Dec. 31, 2020 Closed 20 Liquid Fuel and bioEnergy Supply from CO2 Reduction EPSRC £9,621,480 March 1, 2016 June 30, 2020 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »